Laserfiche WebLink
Tumback Option 1 <br />i <br />• County will pay cost to bring to Pavement Condition Rating level 90 <br />including shoulder paving (Case Ave. - Maplewood) <br />• Paves shoulders if new pavement required <br />• County pays all costs <br />• City puts on MSA system if meets qualifying criteria <br />• County is allowed to redesignate CSAH to: <br />1. County route in city <br />2. County route in county <br />3. New County route <br />• County pays $8000 to non MSA cities <br />Turnback Option 2 <br />• City wants to reconstruct non MSA county route (County .Road F - Arden <br />Hills) This means the ciiy previously dzd not carry MSA designation <br />• County pays according to "County Road" reconstruction Policy (NOT <br />including storm sewers) <br />County pays stone sewer based on percentage of County right-of-way in <br />drainage area (NOT state aid) <br />Payment adjusted by PMS [(90-CR)ICRf * 1993 Condition. Rating <br />• City puts on. MSA. system if meets qualifying criteria <br />• City reimbursed for reconstruction based on contractor invoice meeting or <br />exceeding county share <br />• City authorizes County to redesignate CSAH designation to County Road <br />designation on all proposed turnback routes <br />• County pays $8000linile to non MSA cities <br />