My WebLink
|
Help
|
About
|
Sign Out
Home
2006 04-10 CC PACKET
GemLake
>
CITY COUNCIL
>
PACKETS
>
2000 - 2009
>
2006
>
2006 04-10 CC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2026 8:35:05 AM
Creation date
7/20/2026 8:29:27 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
CC PACKET
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
Show annotations
View images
View plain text
IJ <br />Council has asked that the installation of sanitary sewer and water main be reviewed as <br />part of this study. Although these utilities may ultimately be installed in these areas, it <br />may not be prudent to this at this time. Specifically, recovering the cost related to the <br />installation of these utilities from the benefited properties cannot be accomplished until <br />actual service is provided to the properties. The Council must consider the likely <br />timeframe of service being available to these areas and the financial impact related to the <br />period when considering installing utilities at this time. <br />Roadway <br />Option I - A proposed pavement section of 3.5" of bituminous pavement over 6" of <br />Class 5 aggregate base and l' of select granular borrow would be installed under this <br />option. There will be no concrete curb. Instead, a rolled bituminous edge will be used <br />similar to the existing road edge. There will be minimal restoration costs for ditches, <br />yards, and miscellaneous features. The street related cost of full reconstruction totals <br />$137,400 for Area A and $344,500 for Area B. <br />This option is recommended if sewer and water utilities were installed at this time or if <br />the timeframe for the installation of utilities extends beyond 20 years. <br />Option 2 — An alternative roadway improvement plan would be to overlay the streets <br />with 2" of bituminous pavement. This would be sufficient to extend the life of the <br />existing streets to a time when sewer and water utilities are installed. Areas currently <br />experiencing severe distress would be patched prior to overlay to further extend the life <br />of those areas. The street related cost of a 2" overlay with appropriate patching totals <br />$42,000 for Area A and $106,000 for Area B. <br />This option is recommended if sewer and water utilities were not installed at this time <br />and are expected to be installed in the next 10-15 years. <br />The street restoration program selected will determine the life expectancy of the street. <br />An overlay maintenance action typically has a life of 10-15 years depending on the <br />condition of the sub grade below the existing pavement. A total reconstruction has a <br />design life of 20 years, but will often last 30-40 years if properly maintained. <br />Maintenance Impact <br />The construction of the above -proposed improvements will result in the addition of <br />sanitary sewer and water main. These will require periodic inspection and maintenance <br />in the future when they are put in service. <br />Road maintenance would require periodic seal coating and crack sealing, similar to the <br />current roadway. <br />Right of Way and Easements <br />It is anticipated that all of the construction will occur within the existing right of way. <br />2006 Street Improvements A-GEMLK0503.00 <br />Gem Lake, Minnesota Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.