My WebLink
|
Help
|
About
|
Sign Out
Home
res_7488
Roseville
>
City Council
>
City Council Resolutions
>
07xxx
>
7400
>
res_7488
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 9:17:25 AM
Creation date
4/25/2005 12:15:27 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Resolutions
Resolution #
7488
Resolution Title
Ordering the Construction of Improvement No. P-82-32 and Preparation of Plans and Specifications Therefor Under and Pursuant to Minnesota Statutes, Chapter 429
Resolution Date Passed
3/14/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />718i <br /> <br />Extract ,of Minutes of Meeting <br />of City Council <br />City of Roseville <br />Ramsey County, Minnesota <br /> <br />March 14, 1983 <br /> <br />Pursuant to due call and notice thereof, a regular meeting <br /> <br />of the City Council of the City of Roseville, Minnesota, was <br /> <br />held in the City Hall in said City on Monday, March 14, 1983, <br /> <br />at 7:30 o'clock p.m. <br /> <br />The following members were present: Acting Mayor Johnson <br /> <br />and Councilmen Franke and Kehr (Mayor Demos arrived at 8:10 <br /> <br />p.m.); and the following was absent: Councilman Curley. <br /> <br />Also present were James F. Andre, City Manager; Charles <br /> <br />Honchell, City Public Works Director; Doug Strong, City Public <br /> <br />Works Department; Robert Bell of Peterson, Bell & Converse, <br /> <br />City Attorney; and Peter S. Popovich of Peterson, Popovich, <br /> <br />Knutson & Flynn, City Bond Consultant. <br /> <br />ACTING MAYOR JOHNSON: We will now go to project P-82-32, <br />Matilda Street from County Road C-2 to.lona Lane and Iona Lane <br />from Matilda Street to Farrington Street. <br /> <br />MR. ANDRE: We have the certificate of mailing and <br />affidavit of publication for this project on file. <br /> <br />MR. HONCHELL: This project was petitioned for by 76% <br />of the property owners. The existing width is again approxi- <br />mately 29 feet. The pavement is in fair condition and has <br />good grades. It does have some driveway problems. Some of <br />the driveways have grades of up to 15% - very steep - and <br />some don't conform to the existing standards. The yards are <br />again somewhat higher than the existing pavement. Again, <br />the 32 foot standard roadway is proposed. There may be some <br />adjusting of the existing grades - making it a few inches <br />higher - to better meet the yards and to try and help a little <br />bit on the driveway steep grade problems. <br /> <br />MR. POPOVICH: Mayor and members of the Council, the <br />total estimated cost is $117,048.69. If it was 100% assessed, <br />
The URL can be used to link to this page
Your browser does not support the video tag.