My WebLink
|
Help
|
About
|
Sign Out
Home
2000_0228_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2000
>
2000_0228_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2011 9:52:49 AM
Creation date
9/28/2011 9:47:12 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
unit prices and submit copy to the City ofRoseville. The City of <br /> Roseville shall pay to the Treasurer ofWashington County an amount <br /> equal to 19 percent of the City of RoseviUe's estimated construction cost <br /> plus engineering costs, esoutlined in Section E.2.e. <br /> 2' Washington County shall, when e pay estimate is made tothe Contreotor, <br /> process the necessary paperwork tothe State requesting reimbursement <br /> for the Federal Aid share of the project forVVeshingtonCounb/ endthe <br /> City ofRoseville. <br /> 3. Upon substantial completion of the work, the County shall prepare en <br /> updated revised estimate of cost participation breakdown which will be <br /> based upon the contract unit prices and the actual units ofwork <br /> performed and submit e copy to the City of Roseville. The engineering <br /> costs tobe paid to Washington County bv the City of Roseville shall be <br /> ' <br /> based on this estimated final construction cost. Washington County shall <br /> add to the the City ofRosevi||e's estimated final construction costs the <br /> construction engineering oosts, the costs of supplemental egreements, if <br /> any make necessary adjustments for liquidated demeges, if any, and <br /> deduct the City of Roseville funds previously advanced for the project by <br /> the City of Roseville. The City of Roseville agrees to pay to Washington <br /> County any amounts due, if more than the amount of the total ofthe <br /> partial payments made by the City of Roseville pursuant to Section F.I. <br /> |n the event the calculations show that the City of Roseville has advanced <br /> funds in greater amount than is due Washington County, e refund without <br /> interest shall be made to the City ofRoseville. <br /> G. CHANGE ORDERS AND SUPPLEMENTAL AGREEMENTS <br /> 1. Any modifications or additions to the final approved plans end/or <br /> specifications shall be made pert of the construction contract by change <br /> order or by supplemental agreement but only after concurrence by the <br /> City of Rosevi||e, and shall be paid for as set forth in Section E. of this <br /> Agreement. <br /> 2' Through e duly adopted City Council resolution, the City of Roseville may <br /> request changes to the final approved p|ens, end/or specifications. Any <br /> City of Roseville utility or feoi|ib/ which is subsequently modified or added <br /> to the final approved plans and specifications shall be made by e written <br /> amendment to this /\greement, shall be made pert of the construction <br /> contract by change order or supplemental egreement, and shall be paid <br /> for wholly by the City of Roseville. <br /> H. MAINTENANCE/OWNERSHIP <br /> 1. The City of Roseville shall own and maintain all existing reconstructed <br /> nliorosurfeoed roadways within the City of Roseville. <br /> U' <br /> LIQUIDATED DAMAGES <br /> 1. Any liquidated damage assessed the contractor in connection with the <br /> work performed on the project shall be shared by the City of Roseville <br /> and Washington County in the fo|iovving proportion: The respective total <br /> Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.