Laserfiche WebLink
2.7 Parcel "A"will have approximately 39,283 square feet of land area and Parcel "B"will <br /> have approximately 2 1,234 square feet of land area. Parcel "B" would be a vacant lot <br /> available for construction of a single family home consistent with the requirements of <br /> Section 1004 of the Roseville Zoning Ordinance. <br /> 2.8 Should the request be approved by the City Council,the staff,prior to the applicant's <br /> recording with the Ramsey County Recorder, must review a certificate of survey and a <br /> quit claim deed for compliance with the Council's approval. <br /> 2.9 The Engineering Department has reviewed the proposed minor subdivision and <br /> determined that sanitary sewer,water-main, and storm sewer fees for creating the new <br /> parcel are required. These fees amount to a total of$1,552.27and must be paid at the <br /> time of City signature on the quit claim deed. <br /> 2.10 The Engineering Department has also concluded that the existing sanitary sewer service <br /> for the home will lie on a portion of the proposed lot and must have a 15 foot wide <br /> private easement created over the sanitary sewer that crosses over the newly created <br /> parcel. <br /> 3.0 STAFF FINDINGS & CONDITIONS <br /> 3.1 Staff has determined that the creation of a 100 foot wide parcel is appropriate for this <br /> neighborhood given the existing large lots. <br /> 3.2 Staff also concludes that the proposal would meet the requirements of the Comprehensive <br /> Plan and Zoning Ordinance. <br /> 3.3 The newly created lot must have a width of 100 feet and a depth of approximately 2 13.8 <br /> feet. <br /> 3.4 The applicant must provide a five-foot wide utility and drainage easement adjacent each <br /> property of both Parcel A and B. <br /> 3.5 The applicant must create a 15 foot wide private easement for the existing sanitary sewer <br /> that crosses over the property line (Parcel A to Parcel B) to protect the interest of the <br /> existing home or the service can be relocated without the need for a private easement. <br /> 3.6 A detailed grading plan with the building slab or first floor elevation and existing and <br /> proposed contours must be submitted to the City Engineer for review and approval prior <br /> to building permit issuance for Parcel B. <br /> 3.7 The City policy is to accept park land or cash in lieu of land dedication for the creation of <br /> new lots. In this case, cash will be accepted in lieu of parkland dedication. The <br /> dedication fee is $500.00 for the newly created Parcel B. The fee will be collected prior <br /> to issuance of a building permit on said Parcel B. <br /> PF 3273-RCA(111300)Page 2 of 4 <br />