Laserfiche WebLink
3.4 The site will be subj ect to utility easements and storm water or ponding requirements <br /> because more impervious or paved surface is being created than has existed on the site. <br /> A release of storm sewer easements will be required prior to the issuance of a building <br /> permit and review and approval by city engineering of site drainage will be required. <br /> 3.5 In conjunction with the application for concept development plan approval, the <br /> following documents have been submitted and reviewed by staff in preparation of this <br /> report: <br /> a. site plan including layout of off-street parking areas, location of building, <br /> and landscaping dated: 2/10/99 & revised 3/29/99 <br /> b. building elevation plans dated: 2/10/99 & revised 3/29/99 <br /> C. building floor plans dated: 2/10/99 <br /> d. colored rendering <br /> 3.6 A complete utility service, paving, grading, and drainage plan must be submitted to and <br /> approved by the City prior to consideration of the final development plan. provision of an <br /> easement for an additional 16.6 feet of right-of-way along Lexington Avenue are <br /> required. Completion of the sidewalk (Lexington) and landscaping details are also <br /> required. <br /> 3.7 Based on the proposed use of the building for limited office uses, the off-street parking <br /> spaces for employee and customer parking are sufficient. The site will have a joint <br /> parking easement with the property to the south. Generally if the two sites were used for <br /> straight retail uses, up to 90 off-street parking spaces would be required. However, by <br /> limiting the uses to those proposed or less) and requiring shared parking, 30 to 35 off- <br /> street parking spaces are adequate for the 18,000 square feet in the two buildings. <br /> 3.8 The project, as proposed, is in ha rnony with the general purpose and intent of the City's <br /> Comprehensive Man and Title 10 of the City Code (Zoning). <br /> 3.9 The proposed project will not adversely affect the public health, safety, or general <br /> welfare. <br /> 3.10 The project will have minimal traffic impacts on the surrounding roadways. The Institute <br /> of Traffic Engineers (ITE) estimates that the national range for standard office/retail uses <br /> is from 250 to 400 trips per day, for a 10,000 s.f. building. However, this being a <br /> neighborhood commercial site, it is anticipated that these particular office/retail uses will <br /> generate significantly fewer vehicle trips per day. Staff is working with the applicant on <br /> establishing local counts. Lexington currently has approximately 15,500 to 16,500 trips <br /> per day in this area,while loo sela n has approximately 2,10 o to 2,900 trips per day. <br /> 3.11 The east and north sides of the building must not have any new entrances, windows, <br /> loading docks/doors, HVAC equipment, storage, or employee activities visible from the <br /> adjacent residential properties. (except for emergency exits & for employee lunch and <br /> brew area as proposed on the revised plan dated 3/29/99). <br /> PF 3077-RCA(04-26-99)-Page 4 of 6 <br />