My WebLink
|
Help
|
About
|
Sign Out
Home
1999_0426_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1999
>
1999_0426_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2011 12:57:09 PM
Creation date
9/29/2011 12:41:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. L C,..... <br /> F C1111TY ... I. <br /> DATE: 04/26/99 <br /> ITEM N r <br /> art nt Approval; Ian er Approved: Agenda Section: <br /> LAND USE <br /> It nl escrlption. Speedway SuperAmerica— Request for Concept Approval of Business <br /> PUD to Allow for Redevelopment of the Site Located at 2785 Harnline <br /> Avenue (PF #3073) <br /> 1.0 REQUESTED A. TIOI <br /> 1.1 Speedway SuperAmerica seeks concept approval of a Planned Unit Development in order <br /> to redevelop the existing SuperAmerica gas/convenience store located at 27825 Hamline <br /> Avenue. The proposal would require tb-e removal of the exi stint 2,014 s,f fae i 1 i tv and <br /> canopy area and the construction of a 2,867 s.f. convenience store and ei(2ht (8) gas <br /> within two (2) service islands~ The new facility will be placed in the south%r ,est <br /> pumps facilitate corner of the parcel and :nc lude revised site access to better the vehicular <br /> movement s from.Terrace Drive and Mainline Avenue. <br /> 1.2 A planned unit development (PUD) is a zoning district which rnav include single or <br /> p <br /> mixed uses, one or more lots or parcels, and is intended to c re ate a more flexible. <br /> creative efficient approach to the use of land. Because of the flexibility it offers, <br /> Roseville has used PUD's as the primary zoning tool in redevelopment projects. 1n <br /> considering proposed planned unit developments, the City considers all standards and <br /> purposes of the Comprehensive Land Use Plan to achieve a maximum coordination <br /> between the proposed development and the surrounding uses and historic landmCarks, the <br /> conservation of woodlands, ponding, and wetlands, and the protection of health, safety <br /> and welfare of the community. <br /> 1.3 The process also allo ys the City to consider the location of the buildings} cornpatibi'lit�., <br /> p <br /> p � <br /> arkin areas and other features with respect to the topography of the area and existing <br /> natural features; the efficiency, adequacy and safety of the proposed layout of internal <br /> streets and&ive rays;the adequacy !.And location of green areas, the adequacy, location <br /> and screening of parking areas; and such other matters as the City may find to have a <br /> S <br /> material hearing on the stated standards and objectives of the Comprehensive Land Use <br /> Plan. <br /> 1.4 The tentative hearing and action schedule for this project is as follows; <br /> 04/14/99 planning Commission hearing and action on concept plan <br /> 04/26/99 City Council action on concept plan <br /> 05/10/99 City Council hearing and action on final development plan and action on <br /> PUD agreement <br /> P F30 7 3-RCA(04-26-99) Page l of <br />
The URL can be used to link to this page
Your browser does not support the video tag.