My WebLink
|
Help
|
About
|
Sign Out
Home
1999_0322_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1999
>
1999_0322_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2011 2:03:22 PM
Creation date
9/29/2011 1:36:34 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.4 EXCERPT OF PLANNING COMMISSION MINUTES OF 3.10.99: <br /> 15 <br /> 16 <br /> 17 6. Public Hearings: <br /> 18 <br /> a. Planning File 3104. Bradley operating Limited Partnership (for Cub Foods) <br /> 20 request for vacation of a portion of certain utility and drainage easements in <br /> 21 connection with the re-routing of utility lines located on the southeast side of the <br /> former Homeplace in Har Mar Mall at 2 100 Snelling Avenue, <br /> 3 <br /> 4 Chair Harms opened the hearing and requested City Planner Thomas Pasc hke to <br /> 5 provide a verbal summary of the staff report of March 10, 1999. <br /> 6 <br /> 27 Chair Harms asked for detail of the request. <br /> 28 <br /> 9 Thomas Paschke explained the utility easement vacation process. He noted the <br /> 30 reason for the vacation is to relocate utilities for a new 751000 s.f. grocery store. <br /> 31 <br /> 32 Chair Harms asked if there are similar relocation of utilities. Loeb Bloom <br /> 33 provided the Horneplace original construction as an example. <br /> 34 <br /> 35 The grocery store is a permitted use in a Shopping Center District. <br /> 36 <br /> 37 Member Mulder asked about the role of the Planning Commission 'in the review <br /> 38 of easements. <br /> 39 <br /> Tim Prinzen} Bradley Real Fstate, agreed with presentation by staff. At no time <br /> has Prinzen requested access to any side street from the Center. Thomas P aschke <br /> 42 explained the green space setback. <br /> 43 <br /> 44 Member Wilke asked for clarification oft the need for easement vacation(to <br /> 45 expand the building). <br /> 46 <br /> Page 3 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.