Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
Roseville, Burlington Northern has indicated its desire to not serve this <br /> area with rail capacity. The BN property in generally 100 feet in width <br /> within the City, connecting to a bo to 60 foot ride right of way with <br /> Hennepin county and the City of Minneapolis. To adequately <br /> accommodate either or both a commuter rail line and a <br /> commuter/recreational non-motorized pathway as illustrated in the City <br /> Comprehensive Plan, the 100 foot wide right-of-way should be kept in tact <br /> if at all possible, not allowing parcels of the right-of-way to be sold off. <br /> It is my understanding that BN has filed for an amendment to its federal <br /> Surface Transportation Board abandonment application, that would <br /> eliminate the abandonment within Ramsey County and the city of <br /> Roseville in order to sell off a parcel for reuse I to an adjacent, proposed <br /> warehouse building. It is not in the public's and City's interest to have the <br /> rail right of way sold off in parcels that would severely reduce or eliminate <br /> the continuity of a multi ruse commuter line and pathway/trail system. The <br /> City should oppose this change in the abandonment application and <br /> require BN to follow through on its current application to abandon the line <br /> within the city of Roseville. The City or county should acquire this parcel <br /> with the intent of Keeping the right-of-way parcels in one ownership. The <br /> government agencies holding title could then determine if a short term, <br /> interim lease or easement should be issued to potential users adjacent to <br /> the rail. <br /> Ramsey County in 1989 completed a plan which identified the BN County <br /> Road "C" rail right-of-way as a potential cross-county commuter or light ra i I <br /> line that should be acquired if abandonment is ever sought by 13N. In <br /> 1996, the Ramsey county Regional Rail Authority adopted a resolution <br /> (##R96-o9) which directed the Authority to negotiate for the acquisition of <br /> the rail right-of-way. <br /> The issue of the proposed minor subdivision of a parcel of right-of-way <br /> from the BN rail line (the Triangle warehouse, 5' by 70 feet or <br /> approximately 24,000 s.f.) should not be approved by the City during this <br /> 180 review period (through June 15, 1999) because of the impending <br /> County rail authority study and/or acquisition of this right of way land. <br /> Staff Recommendation: <br /> Staff recommends requesting...the- pity-council to adopt such resolutions of <br /> support ort for acquisition of the rail right-of-way as consistent with the City's <br /> � <br /> Comprehensive Plan and Hennepin and Ramsey County Rail Authority Study <br /> -and Plans. <br />