Laserfiche WebLink
Date ot Final Approval by City Councliew July 12, 1993 <br /> Council: May 24t 1993 <br /> Date of Concept Approval by Planning Commissiono Ap -114, 1993 and May 12, <br /> Conditions i <br /> Public That the <br /> r <br /> a including <br /> reviewed Ighbor yards, be <br /> 2. That the landscape plan t <br /> hat ■ <br /> ■ <br /> City staff review <br /> plans. A final design and location of those <br /> signs should be■ P ■ standing ■ <br /> minimum of a 15 lbot ■ <br /> District drainage <br /> ■ .That a t <br /> ® building <br /> ■ ■ ® issuance This permft should be plan. <br /> permits. <br /> 5. That the final plans for the 36 ■ <br /> northwest comer of the site be designed as shown on the final PUD site plan. <br /> senior housing <br /> ■ <br /> provided. <br /> There should be adequate parking in the � <br /> location <br /> shown. building The <br /> design location <br /> estory and essentially the size and a with the other two <br /> new buildmings. <br /> 6-, That the final plans for the Wture college s <br /> . ® t <br /> ■ TWM nmns that the <br /> MW essendalty as shown on the final PUD■ <br /> funcoons <br /> use voll be for college re a <br /> include dassrooMs, faculty and adminmrative offims, adult education, radio <br /> ■ <br /> ■ <br /> station <br /> parking <br /> parVing needed for ft adiacat student housing- If this parldng is pmWed 'in a <br /> F <br /> parking ■ <br /> mble seft0ft and URll be <br /> . espeaally <br /> constructed of■ * r n the PUD, and 'I[ <br /> f <br /> toward Snelling ■ <br />