Laserfiche WebLink
k <br /> complianoe wkh these issues will be determined by the City Development <br /> f Review Committee. If the Development Review Committee believes that the <br /> design does not fit within these guidelines, this portion of the project will be <br /> referred to the Planning Commission for an amendment to the PUD. <br /> 7. That no building permits be issued for the project until after a closing occurs on <br /> the Simpson parcel. There shall be no use of the site other than the exisfing <br /> auto sales leasing use or the future new college building without prior approval of <br /> the City Council. <br /> 8, That the ponds be maintained by the applicant, designed to meet Metropolitan <br /> Council recommended standards. The City will maintain the pipes leading to the <br /> ponds, and College Properties, Inc. will be responsible for mowing and other <br /> aesthetic maintenance of the ponds. <br /> That the exterior materials of the motel be changed to include brick, in a similar <br /> fashion to the independent living building, such #aht there world be brick all <br /> around the lower level and extended up to the roof at key massing. <br /> 10. That the approvals are contingent upon submittal and approval of <br /> Comprehensive Plan Amendment to the Metropolitan Council. <br /> 11. That the independent living building be constructed as shown on the approved <br /> plan, with the height of the flat portions of the roof not exceeding , the <br /> mansard style roof not exceeding 76 feet in height, and the pitched roofs <br /> covering stairwells and elevator penthouses not exceed 82 feet in height. <br /> 12. That College Properties, Inc. dedicate a new frontage road. <br /> 13. That College Properties, Inc. grant a 50 foot easement to County Ditch 4. <br /> 14, That progress be demonstrated on correction to the soil pion problems <br /> adjacent to the main campus as part of the final Pu D approval, <br />