Previous 1997 PMP Contract A <br /> Change Order_No. 1 <br /> A number of items were added to the contract due to unforeseen circumstances in the <br /> field.The majorlty of Change Order No. 1 was due to conflicts with existing utility lines <br /> on South McCarrons Boulevard that are the proper of the SL Paul water Utility and the <br /> Metropolitan Council Environmental Services. Because'of the age of these utilities, <br /> accurate records were not available to determine their exact locations,resulting in some <br /> conflicts with proposed utilities. <br /> Change Order Igo. <br /> The project includes constructing a number of stone retaining walls to accommodate the <br /> new road,pathway,and parking areas.The original design of the walls was based on the <br /> assumption that no walls would be rewired over 5 feet in height.Due to the addition of <br /> a parking lane,particularly between woodruff Avenue and western Avenue on South <br /> c arrons Boulevard,it was necessary to modify the design of the walls to accommodate <br /> wall heights greater than 5 feet.In two areas,the walls were constructed to a height of 10 <br /> feet For the majority of the walls constructed to a height greater than 5 feet,it was only <br /> necessary to modify the size of the stones used to construct the wall.This modification <br /> results in an additional$71,475 to be added to the contract For the two areas where the <br /> wall was constructed to a height of 10 feet,a much more involved design was required to <br /> accommodate the fact that the stones themselves would not he sufficient to hold back the <br /> soil. In this case the soil behind the walls was reinforced and the stones were placed <br /> adjacent to the reinforced soil. The cost to build the walls in these two locations is <br /> $99,685, <br />