Laserfiche WebLink
S F Inc. 861-2026 � 8/13/98 �� �'� �� �I .5 2 Ali � 2/6 <br /> 7. Recipients ients are selected on a first-come, first-served basis, the city reserving the <br /> right t d ete=ine the s utability of the project for �'prequal.ific ation' . If the pr j ect <br /> is submitted as a completed or in-progress project the city may tale into accouait it's <br /> ability to doc Lmi ent the preexisting home as well as the coi suction. <br /> Preconstruction advice on qualifying for the program will be available (from ) <br /> even if the homeowner is not yet "prequalified". <br /> 8. QSA, Inc. will l�repare lender, builder and architect -information to be available on <br /> request. a cifi c recommendations will not be made, but after a period of time QSA <br /> will develop lists labeled "Your neighbors recommend"'. <br /> 9. A waiting list will be compiled for recipients of the next available ftu.-Lding. <br /> 10. At some point in the future, if the demand justifies, the city could establish an <br /> in-house home improvement advisor to provide ongoing advice to h rneovvners <br /> interested in doing 1-tor-.e improvements within lZoseville. <br /> This revision makes the program less exclusive, permitting homeowners to qualify <br /> b proposing osin ic <br /> a designed project for which they could recover design fees after the <br /> fact. The city can reserve approval to-itil the pr ect is either complete, or well <br /> enou h p lanned and financed to justify committing funds to it. <br /> While this program does not provide enough economic incentive to induce projects <br /> p <br /> that would not otherwise be considered, it does provide the city the opporturtity to <br /> p turn ote good design, and to pub]i ci 7e it as it occurs. Over time, it will be possible to <br /> • <br /> corm de typical lams that can be used by other homeowners as starting points for <br /> p p p <br /> their improvements. The city's inspection department may also be able to identify <br /> typical w ell-designed improvements a s prototypes to spec d approvals <br /> This approach keep h will also the program momentum going through a period when <br /> successful home reconstruction is only being completed by homeowners with <br /> particularly g <br /> articular) strong commitments to the coniniunity and fortuitous builder contacts. <br /> Inc. will serve as an advisory contact to these homeowners and any who are <br /> interested in g <br /> p ursuin the program. Its responsibilities will be spelled out in are <br /> agreement with the City. <br />