My WebLink
|
Help
|
About
|
Sign Out
Home
1998_0727packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1998
>
1998_0727packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2011 11:45:19 AM
Creation date
10/6/2011 11:27:23 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR COUNCIL ACTION <br /> DATE: 7127198 <br /> ITEM NO' 4 <br /> IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIVIVIVIVIVIVIVIU'Yi%riAAN�1T/YYNNWNIIWIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIVIVII��N'M8'M'NUWI�V�W�Wllllllllllllllllllllllllllllllllllllllllllllllllll69➢X11➢X11➢�1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111fAfKAfKAfKiiPlllllllllllllllllllllllll I I I IYk'W�IIIIIIIIIIIIIIIIIIIIIIIIIIII69➢�11➢�11➢�1i�➢QOIW II' <br /> Department Approval: Manager Reviewed: Agenda Section: <br /> Reports and Recommendations <br /> (Continued) <br /> Item Description: Authorization To Proceed With The Construction of A Walking Track <br /> for the Roseville Skating Center <br /> BACKGROUND <br /> During the Kidding process for the expansion of the Roseville Skating Center, bids were <br /> received (as an alternate) for the addition of a walking track. Although this alternate was <br /> rejected' because of the cost, the Council expressed interest in this item and asked that <br /> new prices be obtained. The construction Manager, R.A. Morton, has obtained price <br /> quotations as a change order on the approved project. A revised design was used to <br /> attempt to lower the cost. The following are the results of their work with the contractors <br /> for the walking track addition: <br /> Item cost <br /> General Conditions (reroute NP poorer line) $4;595 <br /> Site Work $14,427 <br /> Concrete/Masonry foundations and floor slab) $47,760 <br /> Steel $41629 <br /> Carpentry 908 <br /> Roofing $187473 <br /> DoorsN indows (Additional $4,400 for 8 more windows) $4,670 <br /> Dry Wall/Finishing/Flooring $20,571 <br /> Mechanical (HVAC) 909 <br /> Electrical (lights and electric heat) $12,078 <br /> Cost $129,019 <br /> Contingency ,000 <br /> Architectural Fees $6,451 <br /> Total Cost $1379471 <br /> The cost of the original project alternate was $150,461 plus contingency. and architectural <br /> fees of $161,011. Dote: This amount did not include a walking floor around the entire <br /> arena, which is included in the current amount. <br /> Staff has researched walking track usage at 5 other public recreation facilities in the Twin <br /> Cities. Although none of the facilities kept separate records for use of the walking tracks, <br /> all responded that they believed their facility experienced regular and in some cases heavy <br /> usage. <br />
The URL can be used to link to this page
Your browser does not support the video tag.