Laserfiche WebLink
time homebuyer families. Such affordable housing may require government mortgage or <br /> down payment subsidies. In addition, the plan requires that additional access to the Arona <br /> site be provided through Terrace Drive and that public open space is provided on the north <br /> side of the site for the neighborhood use and enjoyment. The proposed PUD rezoning <br /> would be a "down-zoning" from the current B-1 business district zone in which most single <br /> purpose business buildings or uses could be constructed, including medical offices, banks <br /> and other similar uses. <br /> 4.7 Recommended Redevelopment Concepts: (The concepts were developed in part with <br /> neighborhood input through a series of public meetings) <br /> • Development to follow Aronafflam l I ne Neighborhood Master Plan concepts <br /> • Developer to be chosen through a Request for Proposals (RFP) <br /> ■ Developer to complete detailed Concept Development Plan incorporation site plans, streets, <br /> types of uses, proposed utilities, etc. as per City Code Section 1008; Developer to return to <br /> Commission and Council with completed General Concept Plan. <br /> i High quality construction with quality and compatible materials required <br /> • Design of buildings to be residential and human scale; the mass and height of buildings to <br /> match the context of the existing construction where possible <br /> ■ Housing of 3 to 5 stories in southwest comer only; office use only in southwest comer, <br /> adjacent to office tower, if housing is not feasible <br /> ■ A mix of housing types required to match needs of first time home buyer, market rate and <br /> empty nester, and affordable senior housing <br /> * New PUD zone lot sizes to vary, depending on housing types <br /> • Street, alleys, and other paved surfaces to be kept to a minimum in order to reduce <br /> impervious surfaces <br /> • Protection of the environmental quality of the site, including soils, landscaping, and ponding <br /> for water quality and storage will be required; existing pond to be improved with a public <br /> walking path that is an amenity to the public (Mr. Forrester) <br /> 0 Street and pathway connections to existing neighborhoods to be maintained and improved <br /> and street access along Terrace Drive from Ham fine Avenue to be installed prior to new <br /> construction on the site (Tim Higgins & Sam Marks) <br /> 0 Public open space access to be improved and to be maintained around ponds and near <br /> existing single family lots and family housing developments (Mike Schneider) <br /> 0 Children's play area incorporated into the public open space (Mr. &. Mrs. Lloyd Dewe) <br /> • Park and recreation dedication of land or fee to be determined as part of development <br /> review process <br /> 0 Utility (sanitary sewer, water, storm sewer) capacities to be determined prior to accepting <br /> developer concept; new storm sewer and pumping of the pond may be necessary <br /> 0 Electrical and tel enhone services to be buried <br /> PF3243 -RCA Concept PUD 032502.doc Page 3 <br />