My WebLink
|
Help
|
About
|
Sign Out
Home
1998_0427_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1998
>
1998_0427_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2011 1:54:03 PM
Creation date
10/7/2011 1:24:17 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The drainage of the site <br /> will be consistent with that of the original master plan. The eastern third of the site <br /> towards the parking lot and be captured by one of the existing catch basins near the entrance <br /> will gain p g <br /> drive, The northern third of the site will drain towards Lydia avenue. The majority of the courtyard <br /> portion of the drainage from the roofs to the west will be captured by Sediment Pond C. <br /> drainage and a , <br /> will be modified in depth and slightly in shape to accommodate this drainage in order to <br /> Sediment Pond� P <br /> " <br /> function as originally intended. A small retaining wali may be installed on the northeast side of the pond to <br /> raise the grades sli gh y tl at the chiller fence enclosure in order for the existing and new plantings to have a <br /> greater effect in screening the enclosure. The remainder of the west side of the site will continue to drain <br /> naturally into the creek. <br /> landscaping tan,a second retaining wall will be constructed along the west side of the <br /> As a part of the R <br /> building to provide ide two areas of dense plantings,one area above the wall and one area below, in order to <br /> . amount of foundation walk exposed to view for the neighbors.The landscaping along the <br /> minimize the <br /> west side will be installed to strategically screen portions of the new building from the neighbor's views, <br /> and also to be consistent with the types of plantings along the creek corridor. Grades at the northwest <br /> corner of the site <br /> will be disturbed as little as possible in order to preserve some of the existing hardwood <br /> 'ni .Other plantings will be installed in the courtyard area and to the southwest of the <br /> trees in this vicinity. F g <br /> courtyard to further scr een views to this central area of the new building. The courtyard or"Central Park" <br /> • support passive and active functions for the residents including a continuous path for <br /> area is designed to s u pp 1 ri <br /> nic are gardening area,a basketball court and a water feature. The courtyard is <br /> wandering,a pi <br /> c �a g <br /> designed to be a safe,controlled environment for these activities and will be enclosed by a wrought iron <br /> fence with brick piers.iers. The east and north sides of the site will be landscaped to compliment the character <br /> that exists along Lincoln drive. <br />
The URL can be used to link to this page
Your browser does not support the video tag.