My WebLink
|
Help
|
About
|
Sign Out
Home
2002_0729_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2002
>
2002_0729_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2011 4:10:26 PM
Creation date
10/7/2011 4:00:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Minutes -- 07/22/02 <br /> Page 16 <br /> Public Works Superintendent Schwartz advised that <br /> Phase I of these projects is on County Road C from Long <br /> Lake Road to the East Snelling Service Drive. The <br /> Feasibility report included details of the proposed design, <br /> including stormwater improvements along the corridor, <br /> overhead power lines relocated and/or buried; <br /> neighborhood impact; and estimated cost of the proposed <br /> projects. <br /> Mr. Schwartz stated that the overall cost of the estimated <br /> $7.58 Million project was a cost share with Ramsey <br /> County and the City of Roseville, estimated at $5.9 <br /> Million and $1.6 Million respectively. Proposed <br /> financing would be through County State Aid funds; <br /> County federal funds secured by Ramsey County; with <br /> City costs over and above those assessable under the <br /> City's new Assessment Policy at 25% on those properties <br /> affected being funded through City of Roseville State Aid <br /> funds; and City of Roseville Stormwater Utility funds. <br /> As part of the project, Xcel Energy has been requested to <br /> bury overhead power lines when possible; and will <br /> relocate twenty-four (24) distribution poles to <br /> accommodate road widening. A cost share between the <br /> City and Xcel Energy would be required for any <br /> additional requested improvements. <br /> Mr. Schwartz further reviewed the Streetscape portion of <br /> the project. Mr. Schwartz stated that several options were <br /> included, as previously directed, to enhance this main <br /> thoroughfare of the City, considered the City's Main <br /> Street. In these options, the levels of streetscape design <br /> range from approximately $626,000 to $1.7 Million; with <br /> ongoing maintenance estimated to range from $25,000 to <br /> $50,000 annually. <br /> Mr. Schwartz presented some concept drawings for <br /> various amenities along the corridor. It was staffs <br /> recommendation that the City proceed with the street <br /> project, with financing as previously outlined. However, <br />
The URL can be used to link to this page
Your browser does not support the video tag.