Laserfiche WebLink
WHY DOES THE CM SYSTEM PROVIDE THE MOST COMPETITIVE <br /> CONSTRUCTION COST'S <br /> Prices from Competing General Contractors <br /> GC GC GC GC <br /> SECTION "All "BPI 11col W <br /> General Conditions $351000 $36,500 $34,800 $35,100 <br /> Sitework 10,000 101500 91800 101200 <br /> Asphalt 1 5,000 149200 1 50100 14,800 <br /> Landscaping 50000 8x000 5,500 5,300 <br /> Cast in Place 25,000 24,500 25,200 24,700 <br /> Masonry 45,000 45700 45,500 441900 <br /> M isc. M etals 11500 11200 11300 1,550 <br /> Structural Steel 25,000 251500 241900 250300 <br /> Struc.Steel-Erection 15,000 14,500 1 4,800 15,100 <br /> Carpentry 3500 3x000 31200 31800 <br /> Architectural Woodwork 41500 5,000 4,300 4,700 <br /> Roofing 10,000 101200 10500 101300 <br /> Caulks&Sealants 21500 21800 21400 2,600 <br /> Insulation 41500 5,000 41700 51100 <br /> Plumbing 151000 15A00 15,500 14,900 <br /> outside Utilities 5,500 5,100 61600 51900 <br /> Gas Piping 4,500 4,000 41300 4,100 <br /> H11AC 351000 34,900 351100 351500 <br /> Electrical 30,000 301100 301400 29,900 <br /> $456,950 $4661750 $50Z600 $4459200 <br /> Not all bid sections are represented. <br /> 1. NO General Contractor has all the low bids. � <br /> 2. You w1ll not know or meet the contractors who will do 75% to 80% of the project. <br /> 3. *. t or correct are section which is over-budget. <br /> �o� do got have the fla�l��l�t�to adjust � <br /> R.A. Morton&Associates, Inc. <br />