Laserfiche WebLink
POLICY OBJECTIVE <br /> The process used for bidding the project is consistent with the required bidding <br /> procedures. The planning and design procedures incorporated the expressed policy of <br /> providing high quality facilities. <br /> FINANCIAL CIAL IMPLI ATION <br /> All options except#1 would be financed $100,000 from the ° 997 PIP and the <br /> remainder from the Recreation Infrastructure Fund. <br /> STAFF RECOMMENDATION <br /> The VISTA 2000 Leisure Committee, the Parks and Recreation Infrastructure <br /> Committee and the Parks and Recreation Commission all have recommended that the <br /> standard of quality for parks and recreation amenities within the park system be raised <br /> to a higher standard. The staff and planning consu ltants have attempted to accomplish <br /> this goal at a lower cost. The current construction market dictates that to meet the <br /> 4 <br /> desired standard it will rewire an increase in the projected cost <br /> COUNCIL ACTION REQUESTED <br /> Motion (1) rejecting all bids and determining whether to a) rebid the project with a <br /> design that will definitely be within the budget or b) abandon the project OR (2) Accept <br /> the low bid for the entire project costing $248,900, OR (3) Accept the bid with all <br /> deducts which would cost $182,280, OR 4) accepting the bid with all deducts except <br /> ##1-auto flush valves, ## =borrowed light frames, #7-laminated safety glass, #8 <br /> concrete apron and #9-roof overhang which would cost $219,000, OR (5) accepting <br /> the bid wroth all deducts except #1-auto flush valves, #2-borrowed light frames, ##7 <br /> laminated safety glass, ##B--concrete apron, #9-roof overhang and #10-cupola which <br /> would cost 231,000 with all options except##1 to be financed with $100,000 from 'Y <br /> the 1997 PIP and the remainder from the Recreation Infrastructure Fund. <br />