Laserfiche WebLink
#3. Accept the bid with all deducts which would include the base building with the <br /> following items: <br /> ' <br /> 1 x000 sq. ft of inside space 40 no overhang <br /> no outside tables/benches `O no exterior drinking fountain <br /> • metal roof regular safety glass <br /> • blacktop instead of concrete apron no seating/storage cabinets <br /> surrounding building (park benches brought in) <br /> 40 no roof cupola '� no rubber tile floor (throw down matting) <br /> "O manual flush valves in restroom %0 concrete masonry instead of borrowed <br /> light frame with tempered glass <br /> exnnsed wood laminated interior beams/d eck i nn "v restrooms storaee room and I nu n n p. room, <br /> The cost of this option is: $182,280. This could be done by reducing a project in the <br /> approved 1998 PIP. <br /> #-4. Accept the bid with all deducts except #1-auto flush valves, #2-borrowed light <br /> frames, V-laminated safety glass, #8-concrete apron and #9-roof overhang which <br /> would result in the following building: <br /> 1,000 sq. ft of inside space 8 feet of roof overhang <br /> no outside tables/benches under overhang no exterior drinking fountain <br /> metal roof ' laminated safety glass <br /> concrete apron surrounding building %0 no seating/storage cabinets <br /> " no roof cupola to no rubber tile floor <br /> %0 'battery powered-auto flush valves in restroo m borrowed light frame with tempered glass <br /> %01 exaosed wood laminated interior beams/deckine restrnoms. storage room and lounge room <br /> The cost of this option is: $219,000. Additional funds would need to be allocated from <br /> the Recreational Infrastructure funds <br /> ##5. Accept the bid with all deducts except #1-auto flush valves, #2-borrowed light <br /> frames, V-laminated safety glass, -concrete apron, -roof overhang and #10- <br /> cupola which would result in the following building: <br /> 1,000 s . ft of inside space '' 8 feet of roof overhang <br /> no outside tables#benches under overhang no exterior drinking fountain <br /> 40 metal roof ` laminated safety glass <br /> concrete apron surrounding building %0 no seafin storage cabinets <br /> roof cupola %0 no rubber the floor <br /> battery p owered-auto flush va Ives in restroorn 114 borrowed light frame with tempered glass <br /> exocsed wood laminated Interior beams/deck inn restrcorns, stora oe room, and lou nae room <br /> The cost of this option is: $231,coo. Additional funds would need to be allocated from <br /> the Recreational Infrastructure funds. <br />