My WebLink
|
Help
|
About
|
Sign Out
Home
2002_1209_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2002
>
2002_1209_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2011 3:50:03 PM
Creation date
10/10/2011 3:35:49 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The project as described above on this Scoping Estimate is a reasonably accurate <br /> description of our ordered/requested project. <br /> Date: _ l_ /_ Name: <br /> Signature: Title: <br /> Please return this form to (addressee, Xcel Energy) <br /> STEP 3: SLOPING ESTIMATE (TO BE COMPLETED BY XCEL ENERGY <br /> To determine whether the proposed project is a special facility, Xcel Energy estimated <br /> the cost to do the project using Company-designated standard construction, and the cost <br /> to construct the project as ordered/requested. If the project as ordered/requested costs <br /> more than the standard construction, then Xcel Energy regards it as a special facility. <br /> The estimated excess expenditures are determined by subtracting the cost of the project <br /> using standard methods from the cost of the project as requested: <br /> Estimate of cost of ordered/requested project: $3 10500.00 <br /> Estimate of cost of project using standard construction: 659000.00 <br /> Estimated Excess Expenditures: $2459500.00 <br /> Standard facility in this circumstance is overhead to overhead line relocation. <br /> Additional comments: <br /> If the landowners involved do not cooperate or if the City of Roseville requests changes <br /> to the assumptions this estimate is based on, a new estimate will have to be produced <br /> based on the new project scope. <br /> If the City of Roseville wishes to change the scope of the project, please let us know. We <br /> would be happy to review those considerations and potential cost differences with you. <br /> Date: 12/2/02 Xcel Energy Preparer Name: Darren Nordskog <br /> Signature: Title: Xcel Energy Electric Designer <br /> STEP 4: REQUEST FOR ENGINEERING ESTIMATE (TO BE COMPLETED <br /> BY REQUESTOR) <br /> After you have reviewed this scoping estimate, please indicate whether you wish to <br /> proceed to obtain more information on construction by filling in the appropriate blanks <br /> below. If you wish to proceed, a more definitive Engineering Estimate is required. <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.