Laserfiche WebLink
PLANNING f SSf oil ACTION <br /> 1 1 9 the Planning Commission held a public hearing on the <br /> �.1 �n January � <br /> request. Doug , <br /> den ned Franchise Associates, and colt Mower, project architect, <br /> sent to answer questions and provide additional informaion. o residents <br /> were pre � <br /> present commented on this request. <br /> ommision discussed traffic circulation on the site, the potential for <br /> �. the Planning , <br /> extending the <br /> access on the west side of properties in this area (County Road B to <br /> Arby's) through Arby's the is site and south to McDonaid's, the need to replace <br /> ]� <br /> . non-conforming pylon sin in conjunction existing n� non�confo � py � J unction with the project, the impact of <br /> existing facility open while the new facility is being constructed, the <br /> keeping the e � � <br /> detached trash enclosure as shown on the site plan, the appearance of the new <br /> . . the possibility of burying or moving the overhead power lines along the <br /> facility, and p � <br /> frontage road. Replacement of the existing non-conforming pylon sign was <br /> discussed at length. <br /> 5.3 The Planning <br /> Commission recommeded approval of the request for a conditional <br /> use permit <br /> to allow the construction and operation of a new take-out/self-service <br /> at 105 Snelling Avenue North, based on the findings <br /> restaurant (Arby's/Sbarro) <br /> . ' Section .1 of this report and with the 11 conditions outlined ® Section <br /> outlined in p <br /> 4.1 of this report, with condition #6 amended as follows (6-1): <br /> ' <br /> . All a sinage for the project must comply with the <br /> current requirements of Section 1009 of the City Code, including the size <br /> � <br /> and <br /> location of wall signs and directional signs. (Change by Planning <br /> Commission) <br /> _q[IGGESTED OTY COUNCIL ACTION <br /> � <br /> 6 resolution, a the request for a conditional use permit to allow 1 the <br /> .' p�rove re� <br /> construction and operation of a new take-out/self-service restaurant (Arby's/Sbarro) <br /> at 2105 ng , <br /> Avenue North based on the findings outlined in Section .1 of this <br /> report and with the <br /> 11 conditions outlined in Section X4.1 of this report, as rnodifed. <br /> Attachments'. Iota Lion map; notification reap; notice of public hearing; proposed site development plans; site <br /> plan, construction <br /> tion sits Ian' building elevations; building floor plan; landscape plan; sig rage plan; and <br /> photographs of property. <br /> 60-day Time <br /> Limit, application submitted on December 15, 1 997; application accepted as complete on December 23, 1997; decision deadline is February 13, 1998. <br /> Prepared by: dim L. Lee, AICP (490-2236) <br /> M-,\RCA1PF2977 <br /> PF## 977- RCA(01126/98) - Page 6 of 6 <br />