Laserfiche WebLink
Move this section of the code to 803.04. <br /> 1 _ . .. - . - - - . . - 411 <br /> 2 Rice Creek Watershed District, Capital Rt Watt, ,. ied Distri t and Grass <br /> 3 <br /> 4 2) Criteria addressed. The erosion and sediment control plan shall address the <br /> 5 following criteria: <br /> 6 a. Conform to the natural limitations presented by topography and soil so as to <br /> 7 create the least potential for soil erosion. <br /> 8 b. Stabilize all exposed soils and soil stockpiles <br /> 9 c. Establish permanent vegetation <br /> 10 d. Prevent sediment damage to adjacent properties and other designated areas <br /> 11 e. Schedule of erosion and sediment control practices <br /> 12 f. Use temporary sedimentation basins <br /> 13 g. Stabilization of steep slopes <br /> 14 I h. Control the storm water leaving-a the site <br /> 15 i. Stabilize all waterways and outlets <br /> 16 j. Protect storm sewers from the entrance of sediment, debris and trash <br /> 17 k. Control waste, such as discarded building materials, concrete truck washout, <br /> 18 chemicals, litter and sanitary waste that may adversely impact water quality <br /> 19 I 1. When working in or crossing water beEliesr ces, take precautions to <br /> 20 contain sediment <br /> 21 m. Restabilize utility construction areas as soon as possible <br /> 22 n. Protect paved roads from sediment and mud brought in from access routes <br /> 111 23 o. Dispose of temporary erosion and sediment control measures <br /> 24 p. Maintain all temporary and permanent erosion and sediment control practices <br /> 25 q. Removal of sediment from streets at the end of each day <br /> 26 <br /> 27 3) Contents of Plan. The erosion and sediment control plan shall include the following: <br /> 28 a. Contact information for the Permittee <br /> 29 I b. Project description: the nature and purpose of the land eftstur-bitigdisturbance <br /> 30 activity and the amount of grading involved <br /> 31 c. Phasing of construction: the nature and purpose of the land <br /> 32 I disturbance activity and the amount of grading,utilities, and building <br /> 33 construction <br /> 34 d. Existing and proposed site conditions: existing and proposed topography, <br /> 35 vegetation, and drainage <br /> 36 e. Adjacent areas,neighboring streams, lakes, wetlands,residential areas,roads, <br /> 37 I etc.,which might be affected by the land d+ t inddistLcrbance activity <br /> 38 f. Soils: soil names,mapping units, erodibility <br /> 39 g. Critical erosion areas: areas on the site that have potential for serious erosion <br /> 40 problems <br /> 41 h. Erosion and sediment control measures: methods to be used to control erosion <br /> 42 and sedimentation on the site,both during and after the construction process <br /> 43 i. Temporary and Permanent stabilization: how the site will be stabilized during <br /> 44 I and after construction(is completed), including specifications <br /> 1111 <br /> -4- <br />