My WebLink
|
Help
|
About
|
Sign Out
Home
CC_Minutes_2011_0926
Roseville
>
City Council
>
City Council Meeting Minutes
>
201x
>
2011
>
CC_Minutes_2011_0926
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2011 12:00:49 PM
Creation date
10/11/2011 12:00:40 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Minutes
Meeting Date
9/26/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Move this section of the code to 803.04. <br /> 41) 1 j. Storm water management: how storm runoff will be managed, including <br /> 2 methods to be used if the development will result in increased peak rates or <br /> 3 volume of runoff <br /> 4 k. Maintenance: schedule of regular inspections and repair of erosion and <br /> 5 sediment control structures <br /> 6 1. Calculations: any that were made for the design of such items as sediment <br /> 7 basins, diversions,waterways, and other applicable practices <br /> 8 <br /> 9 I 1018.05: PLAN REVIEW OF PLAN: <br /> 10 <br /> 11 1) General. The City appoints the City Engineer to review the erosion and sediment <br /> 12 control plan to ensure compliance with the City of Roseville Erosion and Sediment <br /> 13 I Control SpecificationsStandards. <br /> 14 2) Permit required. If the City determines that the erosion and sediment control plan <br /> 15 meets the requirements of this article,the City shall issue a permit,valid for a <br /> 16 specified period of time that authorizes the land disturbance activity contingent on the <br /> 17 implementation and completion of the erosion and sediment control plan. <br /> 18 3) Denial. If the City determines that the erosion and sediment control plan does not <br /> 19 meet the requirements of this article,the City shall not issue a permit for the land <br /> 20 disturbance activity. The erosion and sediment control plan must be resubmitted for <br /> 21 approval before the land disturbance activity begins. No land use and building <br /> 22 permits may be issued until the Permittee has an approved erosion and sediment <br /> • 23 control plan. <br /> 24 4) Permit suspension. If the City determines that the approved plan is not being <br /> 25 implemented according to the schedule or the control measures are not being properly <br /> 26 maintained, all land use and building permits must be suspended and stop work order <br /> 27 issued until the Permittee has fully implemented and maintained the control measures <br /> 28 identified in the approved erosion and sediment control plan. <br /> 29 <br /> 30 I 1018.06: PLAN IMPLEMENTATION AND MAINTENANCE OF PLAN: <br /> 31 <br /> 32 All storm water pollution controls noted on the approved erosion and sediment control plan shall <br /> 33 be installed before commencing the land distar-bingdisturbance activity, and shall not be removed <br /> 34 without City approval or issuance of aappreval-efa Certificate of Completion.Noncompliance <br /> 35 • . • _ .. . . . - . . - . <br /> 36 . <br /> 37 <br /> 38 <br /> 39 1) Existing vegetation shall be retained whenever feasible. <br /> 40 • <br /> 41 - - . . . . . • . - . - . . • <br /> 42 .- - - _ . .. - _ .. . . . <br /> 43 . . . . . . . . . •. : .. . . . : - _ , <br /> 44 <br /> . 46 activity-begins <br /> - 5 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.