Laserfiche WebLink
Move this section of the code to 803.04. <br /> 1 <br /> 2 - . . - : - - . - -_ • - • . discharge are <br /> 3 wed- <br /> 4 - .. : - - - • .••--- . and cat++ of be pl, ea <br /> 5 •• , <br /> 6 . • •• - . • - • . . ••-- : • - a ..,e of.x.« e pad ete , <br /> 7 <br /> 8 -- _ • . . . ' : ' ' . - . .. . . . ,-even} - aliment from big <br /> 9 tracked into the street <br /> 10 <br /> 11 The Permittee shall be responsible for proper operation and maintenance of all stormwater <br /> 12 pollution controls and soil stabilization measures in conformance with best management <br /> mot,-, ct: Permit <br /> 13 practices. . • - - • - - . . •• - - • ' _ - ;ener�r, �-= . <br /> 14 •- - -••• -- • - .. - •- .. . . _ • .•- : . _ mp&i tryo at the situ <br /> 15 •- '- ---• -- • - _. - • . -- '--•-• -- . . . 4 ,-vo all o of the site <br /> 16 , . . . •• : - • .- - stabIIt--r.t: ,...a h o ed <br /> 17 . . . . _: _ _. - _ _ . The Permittee shall al is responsible for <br /> 18 maintenance, clean-up and all damages caused by flooding of the site or surrounding area due to <br /> 19 in-place erosion er-and sediment control. The foregoing resp gall continue until a <br /> 20 Certificate of Completion is issued to the Permittee by the CI, the 1,i,Li disturbance activity. <br /> 21 <br /> 22 <br /> 23 1018.07: MODIFICATION OF PLAN: • <br /> 24 <br /> 25 An approved erosion and sediment control plan may be modified on submission of an application <br /> 26 for modification to the City and subsequent approval by the City Engineer. In reviewing such <br /> 27 application, the City Engineer may require additional reports and data. <br /> 28 <br /> 29 1018.08: ESCROW REQUIREMENT: <br /> 30 <br /> 31 . .. ; : The City shall require the Permittee to <br /> 32 escrow a sum of money sufficient to ensure the inspection,installation, <br /> 33 maintenance, and completion of the erosion and sediment control plan and practices. Escrow <br /> 34 amounts shall be set from time to time by the City Council. Upon project completion and the <br /> 35 issuance of a Certificate of Completion any, the remaining al: >t held r escrow shall be <br /> 36 returned to the Permittee. <br /> 37 <br /> 38 <br /> 39 1018.09: .. ' 9 . e • • . . _ _ , , .. ► I'ERN4--c• <br /> 40 ENFORCEMENT: <br /> 41 <br /> 42 Corrective Work. If the City determines the erosion dime±.ution control is not <br /> 43 being implemented or maintained according to the approved the Pu_.;nittee will be notified <br /> 44 and provided with a list of corrective work to be performed. orrecti c work shall be <br /> 45 completed by the Permittee within forty-eight(48) hours afte ,<ificatir?;, by the City. <br /> 46 Notification may be given by: • <br /> - 6- <br />