My WebLink
|
Help
|
About
|
Sign Out
Home
1993_1213_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1993
>
1993_1213_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2011 3:17:16 PM
Creation date
10/12/2011 3:00:00 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page <br /> Haml ine Avenue <br /> 12/13/93 <br /> Pathway $14,400 <br /> Concrete curb and gutter 21,400 <br /> Waterma in 10g,400 <br /> Shoulder paving 411,000 <br /> Private driveways 25,100 <br /> opt i com signal sy stem 51,000 <br /> Sanitary sewer 21500 <br /> Storm sewer 5,300 <br /> Tree replacement 31800 <br /> TOTAL $128F900 <br /> To- this figure, 22% must be added for preliminary and construction <br /> engineering. The total city participation for the project will be <br /> approximately $15711800 <br /> The estimated amount in the feasibility report presented to the council <br /> at the public hearing showed an estimated city cost participation of <br /> $211,500. The new project cost estimate is approximately 75% of that <br /> figure and reflects anticipated lower bid prices and different cost <br /> participation f ormgl a s when the final estimates have been comp 1 eted. <br /> Financing for the project will come from a variety of sources including <br /> city utility funds, pathway funds, major street fund for the shoulder <br /> and curb and gutter costs, storm utility fund for storm sewer work, and <br /> charges against private property owners for additional private driveway <br /> work* Costs to repair driveways to match grade or replace driveway <br /> entrances as part of the project will be paid for by County funds. <br /> Traffic signal costs will also be financed from the City's major street <br /> fund. <br /> Staff recommendation: Staff recommends that this cooperative agreement <br /> be approved and the city officials be authorized to sign the documents <br /> After receipt of the signed agreement, plans will be signed and bids <br /> advertised for the works Hopefully, the county can complete the award <br /> of bid process in 90 days to allow the bids to be taken and the contract <br /> awarded no later than March 9, 1994. If this is not done, a new public <br /> hearing will have to be held since the project was not ordered within <br /> the statutory one-year time 1 imitation. <br /> RECOMMENDED COUNCIL ACTION <br /> Motion approving cooperative agreement 92015 between Ramsey County and <br /> the City of Roseville for reconstruction of Haml ine Avenue from county <br /> Road B to County Road C. <br />
The URL can be used to link to this page
Your browser does not support the video tag.