My WebLink
|
Help
|
About
|
Sign Out
Home
1993_1213_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1993
>
1993_1213_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2011 3:17:16 PM
Creation date
10/12/2011 3:00:00 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR COUNCIL ACTION DATE: 12/13/93 <br /> ITEM No. : <br /> Department A reval: Manager Reviewed: Agenda section,, <br /> Reports and Recommendations <br /> Item Description: Award of bid, radiant heat system for public Works <br /> garage, City project 92-23, <br /> Background e As part of the 1993 Capital Improvement Program for the <br /> Public Works Department, a heating system has been included for <br /> installation in the vehicle service area of the existing garage <br /> building. This expenditure is a proposed replacement system for the <br /> existing gas forced air heat systeme A radiant heat system is much more <br /> energy efficient than the existing system. The existing system has <br /> reached- the end of its useful life and needs replacement. Radiant heat <br /> system operationally will result in significant savings in heating costs <br /> especially in a facility like the service area where the doors are <br /> frequently opened and closed. <br /> Money has been included in the 1993 and 1994 budgets in the various <br /> Public Works 'Department divisions for this expenditure. Bids were <br /> received for the project on November 16, 1993 , They are summarized as <br /> follows* <br /> rendahl Mechanical, Inc. �151660. 0O <br /> O'Brien Sheet Metal 15r993.00 <br /> Allied Mechanical Systems 16,294 .00 <br /> Cool Air Mechanical, Inc. 16,750. 00 <br /> Northland Mechanical Contractors 16,900. 00 <br /> Wenzel Mechanical. 17#12 o.o0 <br /> Doody Mechanical, Inc. 17, 677.00 <br /> Environmental Systematics 17,883 .00 <br /> Northern Air Corporation 181300* 00 <br /> Alta Mechanical Contractor 18,480. 00 <br /> lamm Mechanical Contractors, Inc* 18,570. 00 <br /> Roseville plumbing and Heatingi Inc. 18,728.00 <br /> �._emier Mechanical, Inc, 1 , . <br /> i(,.rham-oien Mechanical,, Inc. 19,57 o. o 0 <br /> 00 <br /> Ekady Mechanical services, Inc. 1 , 8 . <br /> Son Mechanical and Electric Co. 21, 112*00 <br /> Fo l icy objectives e Building improvements for the Public Works complex <br /> have been included in the Capital Improvement Program for 1993 through <br /> 1997 and in the 1993 and 1994 operating budgets. A copy of the memo <br /> from Public Works staff shows expenditures in 1993 for building <br /> improvements. Approximately 10,o 0 o remains in the C.I.P. fund for <br /> radiant heat. <br />
The URL can be used to link to this page
Your browser does not support the video tag.