Laserfiche WebLink
Page 2 <br /> Arthur Street m <br /> 12/13/93 <br /> the initial phase for Arthur Streets We recommend BRW he retained to <br /> complete this phase of Arthur street. In addition, we will "etain the <br /> rn <br /> firm of O M to analyze the overall regional drainage facility necessary <br /> to begin the design process of a regional pond. <br /> Staff believes it is appropriate that the petition be accepted and a <br /> report ordered with the understanding that if the project does not <br /> proceed, an Development should be charged for all costs associated <br /> the preparation of the feasibility reports As notedr this project <br /> wit h � p <br /> does affect 50 of frontage owned by other property owners, If the <br /> project precedes as a normal public improvement, assessments would be <br /> g <br /> charged against all benefiting property owners. A sketch -rap is <br /> g <br /> attached showin g the Ryan frontage. the frontage owned by the adjacent <br /> p p <br /> r ert , owner on the other side, and the general location for the new <br /> road* <br /> RECOMMENDED COUNCIL ACTION* <br /> Adopt ion of a resolution accepting the petition for Arthur Street north of its present location and ordering the preparation of a feasibility <br /> report for construction of Arthur Street including roadway paving, curb <br /> utter, drainage improvements, and sanitary surer and watermain <br /> and g g ,p <br /> extensions north of existing Arthur Street in the Twin Lakes area <br /> completed recently as part of Project 93-159 <br />