My WebLink
|
Help
|
About
|
Sign Out
Home
1993_1213_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1993
>
1993_1213_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2011 3:17:16 PM
Creation date
10/12/2011 3:00:00 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orr <br /> Sdhdm <br /> OA 14godatES;LLB.. <br /> Park Place Center <br /> 5775 Wayzata Boulevard <br /> November 19, 1993 Minneap*ls,MN 5M16-1228 <br /> 612-595-5775 <br /> 1-800-753-577;5 <br /> FAX 595-5774 <br /> Engineers <br /> Architects <br /> Mr. Steven Gatlin Planners <br /> Director of Public Works Surveyors <br /> City of Roseville <br /> 2660 CiviC Center Drive <br /> Roseville, MN 55113 <br /> Re: Workplan for Stormwater Run-off and Treatment Pond siting <br /> anti mobility Study <br /> OSM Project loo. 5202.00 <br /> Dear Steve: <br /> As a follow-up to our meeting last week please outlined below a description of the <br /> tasks we feel should be undertaken to complete a thorough investigation into the <br /> feasibility of secun*ng land and construing a stormwater rate control and treatment <br /> basin for stormwater run-off that is directed to ' gton Lake. Please consider this work <br /> plan as a draft version and let.me know if there are any other activities or issues you <br /> would lie covered as part of this investigation. <br /> TAI I -, Inventory Background Information <br /> After finali * the work plan for this project with City Staff we will sere all necessary <br /> background information on the study area from the City of Roseville, Ramsey County, <br /> Rice Creek Watershed District, and Minnesota Department of Natural Resources, and <br /> the NTCA. Information on regulatory restrictions or documented water quality <br /> problems that have been speeifi� identi*%,md in the areas will he gathered. <br /> Estimated Cost $2,400 <br /> TASK II - Complete Field Inspection Area <br /> A site inspection of the study area will be performed. Photographs of specific areas of <br /> interest-that may be co ai red for construction of a treatment device will also be taken. <br /> Estimated Cost g <br /> £Nil OX*rMWty Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.