Laserfiche WebLink
REQUEST FOR COUNCIL ACTION DATE: 12/13/93 <br /> ITEM NO <br /> Department oval. Manager Reviewed: Agenda Section: <br /> Reports and Recommendations <br /> Item Descriptionew Resolution approving various project Change orders, <br /> John Rose Minnesota oval, City project 9 - 3 <br /> Background: As the oval project is nearing substantial completion, the <br /> project engineer has worked with all major contractors and <br /> subcontractors to compile a list of final project expenses including <br /> change orders* Many of these items have been discussed at length with <br /> the Council in the past. Each of the three major contracts has been <br /> provided a separate change order review by the project engineer, Jinn <br /> Ma 1 a nd. Copies of all change order documentation are attached. <br /> The project change orders for consideration include the following <br /> components* <br /> John Rose Minnesota oval refrigeration project Change order No. 3 <br /> Labor for rink floor insulation 17, OOO <br /> �- Site landscaping 31,914 <br /> outdoor snowmelt pit 61528 <br /> - - Topsoil for center islands 6,360 <br /> _- Removal of excess material 3o338 <br /> TOTAL $65F140 <br /> John Rose Minnesota oval lobby building Change order loo. 1 <br /> Change from concrete block to jumbo brick as $13,000 <br /> exterior finish <br /> Upgrade brick/block material standards 21495 <br /> Add elevator 31.r 004 <br /> snowmelt pit in existing arena 36,741 <br /> 392 <br /> �. ' Soil correction modifications for building 1 , <br /> foundation <br /> Various building upgrades and changes 15,712 <br /> �,.I.od i f i cations to existing building structural , <br /> conditions <br /> TOTAL $113,652 <br /> John Dose Minnesota oval mechanical support building Change order No. 2 <br /> Miscellaneous building modifications SlOo201 <br /> TOTAL $10, 201 <br />