My WebLink
|
Help
|
About
|
Sign Out
Home
1993_1213_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1993
>
1993_1213_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2011 3:17:16 PM
Creation date
10/12/2011 3:00:00 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 , The Public Works Department has made the following <br /> recommendations O <br /> a. That sidewalk be provided along Grandview Avenue. <br /> b. That a traffic study be done. <br /> C That a storm sewer study be done to determine i f the <br /> existing storm sewer in Lexington Avenue can handle the <br /> additional runoff. <br /> d. That all curb cuts must be done as per Roseville Is <br /> standards.. <br /> e. That all utility and street work must be done per <br /> Roseville's standards. Any utilities that are turned to <br /> the City must be located in easements. <br /> f* That staff review and approve final landscape plans. <br /> 6. The Planning Commission, at their December 9, 1993 meeting, <br /> considered this request. Because of the change in the meeting <br /> date of the Planning commission meeting, the emotion on this <br /> application will be presented at the December 13 , 1993 meeting. <br /> Staff Recommendation <br /> 1F It is staff' s conclusion that while we would recommend <br /> development of the site as a townhouse project, there is <br /> additional information which must be provided to determine if <br /> the project, as proposed, will work on the site without having <br /> adverse effects on -the adjacent streets and neighborhood <br /> Therefore, staff recommends that the City Council continue <br /> consideration of this application until the January 24 , 1994 <br /> City council meeting. This will allow the applicant additional <br /> time to address issues identified by the public Works <br /> Department and any other issues which may be identified at the <br /> public hearing. <br /> Council-_Action Regue sted <br /> 1 Motion to continue Good value Homes request for PUD concept <br /> Development Plan approval, rezoning from R-3A and H-1 to PUDI <br /> Comprehensive plan change from Limited Business to High Density <br /> Residential <br /> Staff Report by: bike Falk <br />
The URL can be used to link to this page
Your browser does not support the video tag.