Laserfiche WebLink
5, 27% of the site is designated for green space and landscaping. <br /> Landscape species size and spacing are consistent with the <br /> design' standards chapter of the Roseville zoning ordinance and <br /> the requirements for interior parking lot landscaping have also <br /> been met. The landscaping plan is consistent with the <br /> landscaping plan approved and now planted in the first phase of <br /> the Twin Lakes Redevelopment projects <br /> 6o The facility is designed to accommodate_ high turnover parking. <br /> The site plan shows 256 parking stalls provided which <br /> translates into 1 stall for every 175 sq. ft. of the 43 , 904 sq. <br /> ft* of medical space on the first and second floor. The lower <br /> level of the building is for storage, record keeping, and an <br /> employee cafeteria <br /> 7. Surface water and storm drainage are important issues in the <br /> Twin Lakes Redevelopment Area, Fong range plans call for the <br /> provision of a regional pond, immediately north of this area, <br /> which would be constructed in 1995, During the interim, a <br /> temporary pond designed to handle current development runoff, <br /> has been proposed- on the site adjacent to this proposal , which <br /> is currently owned by Ryan Construction Company. All other <br /> utilities are currently available to this site, <br /> 8 . The buildin g is designed with an enclosed trash room to meet <br /> Roseville City standards, The developer is currently preparing <br /> information to be provided to City staff regarding the rooftop <br /> mechanical systems, They have indicated that the systems are <br /> being designed so that they should not require screening beyond <br /> t he parapets y are ets alread provided for in the building design, This <br /> will need to be carefully reviewed and if additional screening <br /> is necessary, the developer has indicated that they will comply <br /> with City standards. <br /> 9 , The Planning Commission, 'at its November 10, 1993 meeting, <br /> recommended approval of Ryan Construction's request for <br /> rezoning and preliminary and final plat at 1831-1853 W. County <br /> Road C subject to ponding construction, prior to building <br /> construction, being reviewed by the City Engineering staff. <br /> Staff Recommendat : <br /> 1, The 62 ,275 sq, ft. medical center proposed by Ryan is the <br /> second phase of -the redevelopment of the Twin Lakes area, It <br /> meets or exceeds all City design standards and will be a <br /> handsome addition to the community at this prominent location <br /> on County load C and Fairview Avenue, The rezoning and <br /> preliminary and final plat are consistent with the City' s <br /> comprehensive guide plan and the redevelopment plan for this <br /> area. They are necessary to begin construction of this <br /> facility. As we understand it, demolishing of the Mack Hotel <br /> and _the Mart building will commence yet this year with <br /> construction to . follow, Based on the fact that this proposal <br /> :Ls consistent with the redevelopment plan for the Twin Lakes <br />