N <br /> Page 2 <br /> Delete the east segment of the project from Victoria east to <br /> Rice and construct only the west half on County Road C from <br /> Victoria west using federal funds. The City's 0 share <br /> would still be required over this segment and federal <br /> financing would pick up 80% of the construction cost* The <br /> City could in the future, if it desired, construct a pathway <br /> east of Victoria on county Road C. <br /> 3 # Construct dual facilities on County Road C including an on- <br /> road pathway and a parallel pedestrian sidewalk. The on- <br /> road pathway would require a fear to six foot roadway <br /> widening and replacement of curb on one side* The off-road <br /> pathway could then be built to city standards for <br /> pedestrians using a four-foot boulevard and five-foot walk <br /> 4, Build the bikeway on a parallel road on the segment of County <br /> Road C between Lexington and Ricee <br /> 5. Allow the project to be reviewed as -originally proposed <br /> except -that design exceptions would be requested over the <br /> section from Rice to Victoria for a one-side pathway <br /> including a four-foot boulevard and a five-foot paths <br /> These five alternates will each be explored in greater detail . <br /> However, the alternate involving construction of an do-road <br /> facility on County Road C or a facility on a parallel, adjacent <br /> roadway are not feasible given the current schedule. The <br /> parallel facility along County Road C on an adjacent roadway is <br /> not practical, because there is not an existing parallel road <br /> within a reasonable distance to County Road C that could be used. <br /> The only alternatives for consideration would be to designate <br /> Count y Road B-2 as the alternate route from Victoria to Rice and <br /> construct a linkage segment on Victoria from County Road C to <br /> County Road B- . This segment could be designated as a bikeway <br /> and a sidewalk for pedestrians could still constructed on County <br /> Road C from Victoria to Rice* <br /> During the next two weeks, we will be reviewing these alternates <br /> with the Met Council and their staffs we anticipate an <br /> appearance before the funding and programming committee at its <br /> next regular meeting on November 18, 19 9 3 a At that -time, we <br /> expect to receive direction from the committee regarding what <br /> alternates are feasible <br /> Following that meeting, we could begin the neighborhood <br /> involvement P rocesse I would suggest that that process be fairly <br /> low key and that we have a small group and a very structured <br /> agenda in terms of alternate designs and locations. We <br /> anticipate. the committee would meet no -more than two or three <br /> • weeks with a final approved <br /> times over a period of s i to tort we pp <br /> concept report completed on or about February 1, 1994 * <br /> At the same time, design n p lans would have to be moving through <br /> the review process, so final plan approval could be completed in <br /> February to meet the scheduled bid letting of May, 1994 <br />