My WebLink
|
Help
|
About
|
Sign Out
Home
1993_0405_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1993
>
1993_0405_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2011 8:43:23 AM
Creation date
10/18/2011 1:10:16 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EX BIT B <br />1993 -1994 RQS.EULLE PATHWAY PROJECT FEE ESTIMATE <br />A FEASIBILITY STUDY <br />• Project Path Report <br />• Public Meetings <br />• Project Study Report <br />• Alternative Analysis <br />• Preliminary ROW Determination <br />• Standards <br />Feasibility Study Sub -Total <br />B DESIGN SURVEY <br />• Collect Field Data <br />C FINAL ALIGNMENT /SCOPE DESIGN <br />D FINAL PLANS &SPECIFICATIONS <br />E CONSTRUCMON SERVICES <br />Contract Administration <br />• Construction Inspection <br />• <br />Field Surveying <br />F TOTAL <br />Fee Ranize <br />$ 2000 - $ <br />5,000 <br />$ 1,000 - $ <br />31000 <br />$ 3,000 - $ <br />5,000 <br />$ 81000 - $ <br />75,000 <br />$ 2,000- - $ <br />4,000 <br />$ 4,000 - $ <br />6,000 <br />$20,000 - $ <br />38,000 <br />$ 7,000 - $ 91000 <br />7,000 10,000 <br />$12,000 - 15,000 <br />$35,000 - 50,000 <br />Cost Proposal based upon estimated construction cost of $572,000 <br />*�` Services for ROW Acquisition are not included in the 'proposal <br />
The URL can be used to link to this page
Your browser does not support the video tag.