Laserfiche WebLink
EXHIBIT A <br />WORK PROGRAM <br />Supplemental Agreement No. 13 (Thirteen) <br />1993%1994 Pathway Project <br />A FEASIBILITY STUDY <br />• Participate in Neighborhood Information and Focus Meetings (Up to Six <br />Total) <br />• Develop Concept Alternatives for Pathway <br />• Evaluate Alternatives <br />• Define Project Standards <br />• Produce Preliminary ROW - Parcel Acquisition Map <br />• Produce Project Path Report <br />• Produce Project Study Report <br />• Participate in Project Public Herring <br />• Produce Preliminary Cost Estimates <br />• Produce Implementation Strategy <br />• Assist City in Funding Strategies <br />• Assist City with Agency Cooperative Agreements <br />B CONDUCT DESIGN SURVEY <br />• Field Survey (Total Station) of Path Corridor <br />• Assemble CAD Base Map of Corridor <br />OD FINAL DESIGN <br />• Conduct Necessary Meetings with City to Determine Final Project Scope <br />• Complete final Design of improvements <br />• Provide Engineer's Estimate of Cost <br />• Assist City During Bidding Phase <br />• Assist City During Contract Award Phase <br />E CONSTRU ON SERVICES <br />• Administration/Inspection <br />• Conduct Preconstruction Conference <br />• Shop Drawings Review of Plans by Contractor <br />Administrate Project Including: <br />. <br />Partial payments <br />A Final )Payment <br />• <br />Supplemental Agreements <br />Contractor issues <br />• Provide Full -Time Project Observation as Required <br />• Complete Final Project As -Built Plans <br />• Administration to be in Accordance with Procedures for Federal Project <br />■ Construction Staking . <br />• Provide Field Staking of Improvements <br />PLEASE NOTE: Materials testing by a soil testing company is not included. This is wm-w� <br />normally a direct contract between the City and the testing company. <br />0 <br />