My WebLink
|
Help
|
About
|
Sign Out
Home
1993_0322_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1993
>
1993_0322_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2011 8:41:56 AM
Creation date
10/18/2011 1:20:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 ' <br />93on.10 <br />The proposed scope of work provided by p <br />attached for council review. <br />actives The use of an outside consult t for a project <br />this Lure is consistent with past practice the city "s policy for <br />retaining consulting en ineers a because of the coupl er it of CAB, <br />ro edt the size of the engineering contract s and the need to <br />P # <br />with private develo s# we suggest the City council consider <br />•cocrdina to p <br />:- <br />t.he proposed en sneering contract* <br />z NS <br />ided a cost msttmate for necessary-` <br />easib lity report and engineering plans and <br />-- <br />cations for this project* Overall estimated pr liminary cost for <br />•• <br />the ova fete improvement is 1 9 1 to 1 4 million dollars a S proposed <br />•r. <br />1proj ect budget of, coo is in the range of 10 to 12 of the <br />•'; ` <br />anticipated construction cost-Is <br />reflects smevh&t hi#hp it While this fiqure seen anticipated an <br />ve public involvement rocess working rit the neighbors <br />e�ctens i p � <br />affected businesses, and to consider all feasible alternatives for <br />e complete project area • e budget reflects tetra work effort <br />ate the project in a timely manner to meet the reguiremente of <br />comp p j <br />rr <br />ink review and the needs of the Paul # a place _ developer. <br />The project is proposed to be ased ftb the first phase including <br />construction of Lincoln Drive north of county Road CIIm2 which vould be <br />completed in phase Mould include final cleanup and paving of <br />- <br />section of Lincoln Drive north of -County Road C_ 2 and <br />} <br />complete construction of Lincoln Drive fram County Road CIaw2 to Terrace <br />Drive d co=ty Road C" f rozi Lincoln Drive to Snelling Avenue* <br />• YK <br />mn_ _ <br />M1r Y <br />c 1 Sb COUNCIL ACTION <br />• <br />Adoption of a motion approving engineering service agreement betvaen the <br />*..Ft <br />city and Shorte Z11jottir Hendrickson for pro f ect 93aw,10.v Lincoln Drive <br />m Count Road O� to Lydia Avenue as out lined proposal <br />261 1993, and authorization of signature of the agreement by appropriate <br />-r <br />. -.`• <br />city off icials <br />J <br />q, <br />. <br />• l <br />ti <br />
The URL can be used to link to this page
Your browser does not support the video tag.