Laserfiche WebLink
Mr. Steve Gatlin <br />January 2, 1993 <br />Page Two <br />We wish to note that Mcphi ll s is not forcing the issue and demanding an " ", but in our <br />o 4* the work was dom in good faith, and quickly to keep the building dry. We have <br />mcluded Change Order KA to cover theme additi al costs. As you noticed, in the past, I have <br />always reviewed Contractor changes with the City's -best interest in rind and have refused those <br />I felt were unarm table. In this particular cam, I feel that McPhillips should be paid the <br />additional costs they iocun -ed on behalf of the City. Should the City, desire it, I am willing to <br />revww the situation, that resulted n ts increase ,with them. <br />sinar6y yours, <br />1006IJ04e000til <br />Peter M. Brazek, AIA <br />Project Manager <br />.) <br />Encl. <br />