Laserfiche WebLink
PROPOSED PROJECT STAGES AND <br />CONCEPTS <br />The following stages and conocpts are planned for the Rosedale 'area to <br />address the previously defined problems: <br />stale IA+ Advanced TInrf is Management System (ATM S) for the <br />e Area which will include an ama,,wj* de traffic monitoring <br />system that would be used to provide information at each exit of <br />Ow Rosedale . Shopping Center on the best ess route to the <br />regional roadway system* KiosWvi deo ojonitors am popowid to <br />o�ri de the information 10 shoppena iwd unployem on <br />roadway /transit editions. Snecial old be given to <br />routing HOV users to do 1. Nive FVV acmw As Advan <br />'1 mveler Information gyslem (ATM ■drile employees, <br />hopiem transit riders} and coin hicl on tip - refwed <br />route, During the State. Pair md for events at the John lose <br />Min-M Oral MultimPurpose Rwreation Facility, guidance to the <br />pairk-iride facilit s would be given. <br />Stage EB: Provbion of an exclusive HOV accesslepress <br />Interchange on ' 36 between TH 51 (Snelli <br />