My WebLink
|
Help
|
About
|
Sign Out
Home
1993_0216.ws_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1993
>
1993_0216.ws_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2011 8:01:24 AM
Creation date
10/18/2011 2:22:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT PHASES <br />7U t � to be �i�d out in fi ses <br />0 N nitlon and Preliminam i m : IVHS cowepts <br />will be defied} a sy�n phasing plan will be developed, l financial <br />arran is wed, a governance p to, and <br />pmuminary design complew. <br />Sian tarn and IntiL ent: For the Stage and <br />fft� EB t.. elernents, the quired bid ducu ents will be <br />pml�amd,, and the IVHS pornt and do midway com pin t <br />grill be procured. <br />so F1 " Im lL n tiun: M be <br />itnp�rted. <br />ftkg a t ' g the der ned objectives <br />for the IVHS/IiOV Project will be evaluateda <br />Full 2MIM t: If mxx=ful, the planned subsequent stages <br />would be implanted. <br />1 <br />ttrne schedule for the empledon of ewh phase for the <br />Stage IA A7MS is outlined below: <br />PHASE FOR STAGE IA: TIME TO COMPLETE <br />AIMS ROSEDALE (SEQUENTIAL). <br />Concept WinitimqftUmInary Design 34 months <br />Plan Pr+epamdonUtial Procurement 5-9 months <br />Projoct 1mplemantation 542 months <br />Project Evaluation 12 -18 months <br />Full. Deployment � <br />.nom 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.