Laserfiche WebLink
Page <br />Steven sarozy <br />February 11, 1993 <br />Because <br />of current staff loads, this work cannot be done by the <br />n ineer in . de art�nent . Also we are not qualified to prepare <br />� � �� � or to provide the level <br />legal descriptions for easement recorlding <br />andsca a design detail necessary for this project. <br />of p � <br />it wishes to roceed,.it will be necessary to retain <br />If the count p <br />a landscape arch itect engineer/ surrveyor to provide design <br />services for the word* ]estimated costs for design services will <br />be about 1 <br />of the total budget of $572,000 or approximately <br />$85,000a <br />we suggest the council consider the project at the February 16 <br />� to accept the rant and <br />work sessions, I f the council 1 wants p g , <br />d with the ro soto it will be necessary for us to retain a <br />proceed p+ � <br />ant to provide the design -services as soon as possible; <br />consult p <br />t a consultant be selected <br />We sugg�s from the existing city pool have provided design services <br />or using a pool of other firms who p <br />to the <br />city within the past three years e We have prepared a <br />preliminary list of pre-qualified firms and contacted them to see <br />whether they are interested in providing design services. A copy <br />of the <br />submittal sent to these consultants is attached* -Work <br />should begin in on the design of the improvement project this <br />spring, so p <br />' lans can be completed and right-of way acquisition <br />finished proposed osed schedule is contained in the consultant <br />p <br />letter# <br />a fund has a balance of approximately $103,000 , as of <br />The pathway <br />a 1 1 9 9 3 , The pathway fund it used annually , to finance <br />January � , <br />wa improvements including design and construction costs. An <br />pathway P <br />additional $67j000 will be added this year to the fund consistent <br />with th �� e approved budgets This will make the total fund balance <br />$1700000o <br />Of this amount, approximately 70,OOO is committed to <br />1 anned for 1993 to be constructed on-Cleveland <br />Avenue and pathway projects p <br />Haml fine Avenue as part of Ramsey County " s improvement <br />d the MADO projects recently finished on Rice Street. <br />program a31 <br />the pathway fund could be used to finance design <br />The balance �n p y� <br />and r i ht- of--wa acquisition it ion lost s for this project. We <br />fees a g y . <br />e that the acquisition costs for right�of -way will be <br />assume � ht -of -wa necessary <br />significant based on the large amount of r g y <br />and the impact of the proj ect to existing landscaping features. <br />ason there may not be adequate funding in the pathway <br />For this re � <br />fund f or right�pf-way acquisition this year. Additi <br />ona l <br />ode i n 1��� and <br />appropriation from the fund may , have to be m <br />. e this x�o ect <br />beyond to completely finance p ]. <br />The of the construction city share n budget of $114,500 can be <br />� terns including <br />ed in art within in kind "soft match ", � g <br />prov id part <br />truction tree replacement, turf r�estoraticn, and'other <br />sign cons , <br />f a remaining local match will have to be funded .from <br />services. <br />the pathway fund or other - sources i <br />