Laserfiche WebLink
r• <br />a_4 <br />RECOMMENDED PROJECTS FOR FEDERAL FUNDING <br />1993 BIKEWAY AND WALKWAY <br />STANDARD BRAY AND WALKWAY <br />NAMM - Bloomington Bike Ride Facility <br />ERAL COWe $174,000 <br />AGENCY** aty of BI gton <br />DES D : The project consists of on�street bikeways, off -stmt bituminous <br />bike paths, signage, bike lockers, racks and promotional material <br />designed to mate a bike and ride s�stern to and at the Mall of <br />America Transit flub, 5. 5 miles of stripoUsigned bikeway lanes will <br />be d eloped along 84th, 88th, and old cedar Avenue. 2.3 miles <br />of bituminous hike path will be constructed on 86th and old <br />Shakopee road linking to the ]Mall of Americ& <br />NAMM Cedar Lake Parr 'transportation COrridOr <br />ERAL COST: 5DO9000 <br />AGENCY: City of Minneapolis <br />DESCRI ON: 'the City wfll construct a 3.1 mile long alternatie transportation <br />system adjacent to the Burlington Northern right of way. The <br />system will consist of 2 directional bikes and a separate <br />pedestrian way finking the St Louis Par olden Valley area with <br />Downtown Minneapolis. <br />3, NAME Eli Regional Frail Condor <br />DEEAL COST: 2409 <br />AGETCY# Ram County <br />DESCRIPTION* 'I'h proj= consists of construction of a 2 mile off zoad faedity on <br />an abandoned stretch of railroad. The facility will proceed along <br />the abandoned Burlington Northern (BN) railroad line from Beare <br />avenue in Maplewood to the eastiwest Willard Munger State 'trail+ <br />'this facility gi <br />