My WebLink
|
Help
|
About
|
Sign Out
Home
2003_1124_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2003
>
2003_1124_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2011 8:52:45 AM
Creation date
10/19/2011 1:00:58 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Install two (2) additional valley gutters per quote of 6/23/03. <br />ADD $1,836 <br />5. relocate the sanitary sewer manhole 50 feet to the East of the shown location due to <br />the actual elevation of the existing pipe Doing 2 feet Higher than the plan shows. <br />ADD $29716 <br />6. Replace two (2) sections of curb and install handicap access curb. This curb was <br />staled by the City surveyors and is net being accepted by Mc Gough or the City of <br />Roseville. <br />ADD $0 <br />T Charge to Imperial Developers for Muska Electric to repair the broken conduit and to <br />run new phone wire from the public works Building to the McGough trailer. This <br />charge also includes the cost of the splice kit phone cable. This damage was caused <br />by hniperial Developers. <br />(DEDUCT 1,294) <br />8. Charge to Imperial Developers for Master Technology Group emergency repair of the <br />damaged conduit, copper cable and fiber optic cable. This damage was caused by <br />Imperial Developers <br />(DEDUCT $2,650) <br />9. Add for Alternate #1 to dig footings for the forth public works Yard screen gall. <br />ADD $1,500 <br />10. Add for Alternate #2 to dig footings for the South Public works Yard screen wall. <br />ADD $1,500 <br />11. Install permanent electrical power to the existing Maintenance Garage instead of <br />temporary power, as called out in the contract documents. This change was made <br />through Imperial Developers. See the letter horn Imperial Developers dated July 25, <br />2003. <br />ADD $3,650 <br />12. Repair 200 Amp. Existing underground conduit between Public works buildings that <br />was cut by Imperial Developers on September 9, 2003, around 10;30 a.m. <br />(DEDUCT 4,219) <br />13. Imperial Developers submitted a price of $ 650 to add grading for two new stoops at <br />Grid 1, G and 7, H. Per a phone conversation with Jar Hambroff on November 6, <br />2003Y we will trade this cost for the work that was deleted at the bus stop area on the <br />West side of Civic Center Drive. <br />ADD $0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.