Laserfiche WebLink
teenbure- watrud Add $55 ,1984 <br />1t Add for PR #1 concrete and rebar changes. See the Steenberg- watrud letter dated <br />August 5, 2003. <br />ADD $89003 <br />2. Add for PFD #2 concrete and rebar changes. See the Steenburg later dated September <br />292003, <br />ADD $5,011 <br />3. Add. for PIS #3 concrete and rebar changes. See the Steenberg letter dated August 28, <br />2003. <br />ADD $2,947 <br />4. Add Alternate #5C to add the sidewalk across Civic Center Dive to the Ice Arena. <br />This price was included in the ofiginal hid. <br />ADD $59800 <br />5. Add Alternate #6 to provide brick/block footings at the generator screen wall. This <br />price was included in the original bid. <br />ADD $1,400 <br />6. Add footings for North screen gall in the public works Yard, as indicated in <br />Alternate #1. <br />ADD $13J00 <br />7. Add footings for South screen wall in the Public works Yards as indicated in <br />Alternate ##. <br />AID $139900 <br />8. Add for the lost time clue to inconsistency in survey. This was for the footings at the <br />new Public Safety Building. A job work order was signed by Mc Gough. <br />ADD 8 <br />9. Add for installing precast keyway at the new alt/ and Storage Building. Both <br />embeds and a keyway in the footings were required per the Hanson shop drawings. <br />AID $1,244 <br />10. Per required in RFI #6# dovetail slots were added at the poured concrete columns on <br />the South side of the lower level of the Public Safety Building. These slots are <br />needed for the attachment of the masonry to the concrete. <br />ADD $506 <br />1. AI #6 made some dimensional changes to the elevator shaft area. Some of these <br />changes moved concrete walls that had already been formed up; therefore, Steenberg <br />has a cost to disassemble, move and set up the forms in the revised location. <br />ADD $15195 <br />Manson SiDancrete Kidd _ $74,967 <br />1. Add for Alternate #1 to fi nish and install the precast screen wall on the North side of <br />the alt/ and Storage Building. <br />ADD $42,34 <br />2. Add for Alternate #2 to fhrnish and install the precast screen wall on the South side of <br />the alt/ and Storage Building. <br />AID $37,981 <br />I Deduct for 50' -0" of screen wall that was "doubled -up" in the original bid. See the <br />Hanson letter dated .Tune 27, 2003. <br />(DEDUCT $8,490) <br />