My WebLink
|
Help
|
About
|
Sign Out
Home
2003_1124_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2003
>
2003_1124_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2011 8:52:45 AM
Creation date
10/19/2011 1:00:58 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Development area such as the proposed Allina site. There are between 16-28 <br />parcels which could fit this definition, over which an area -wide assessment could <br />be placed. Area wide assessments are normally pro -rated on a square foot basis <br />of the total parcels within the "area- wide' calculation. No one property will hear <br />the costs of all the parkway. Usually such areas vs. front foot costs are 25% area - <br />wide, 75% front foot, or some similar ratio. For example, the actual road <br />construction cost estinxiated at $6 million would be broken out into $1.5 million <br />area -wide and $4.5 million on a front foot basis. Using this formula the cost to an <br />11 acre Allina site would be estimated between $ 100,000 - $200,000 spread <br />across 20 years. <br />low- interest, deferred assessments for other off -site road improvements related <br />to the Twin Lakes Parkway such as rebuilding of County road C and the <br />Cleveland Avenue intersection would also be supported by the City. However, <br />the impact to the Allina proposed parcel for these ancillary improvements would <br />be minimal using the same area -wide assessment calculation explained above. <br />Generally, the city share of the construction and landscaping costs for these <br />intersections is less than 25% ($250,000) of the total $1 million project costs. <br />Using the same area -wide calculation as above, the costs, which would be split <br />on a square foot basis throughout the County Road C area, would be 25% of the <br />City's costs or about $62,500. <br />Low interest deferred assessments may also be supported for the required storm <br />water improvements as part of the construction of the project. The City will <br />work closely with Dice Creep Watershed District on this issue throughout Twin <br />Fakes Redevelopment Area to assure that previous regional ponding would be <br />taken into consideration when reviewing redevelopment in the area. The City will <br />continue to meet with Steve Hobbs of the watershed District to discuss the <br />previous work and assessments for storm water as well as any new requirements <br />that Dice Creek watershed might rewire for the Allina proposed site. <br />4. The use of eminent domain is an available public purpose tool that the City has agreed to use <br />within the Twig Lakes Redevelopment area, which includes the Allina site, to further the <br />public purposes of the Twin Lakes Redevelopment Plan. As a last resort, to establish fair <br />market value, the City will use this tool to assist Allina in acquiring the necessary land for <br />their project. <br />5. Roseville will support the use of its US EPA Brownfield Devolving Loan Funds, which <br />Provides deferred and/or forgivable loans for environmental cleanup associated with the <br />redevelopment in Twin Lakes. <br />6. In addition, the City would apply for contamination clean up funds from the Metropolitan <br />Council's Tax Base Devitalization Grant. This grant has a semi - annual cycle and reimburses <br />communities for contamination as part of the redevelopment process. The City in turn would <br />reirburses Allina and/or Ryan Companies for any the clean up costs associated with the site. <br />7. The City of Roseville is currently working with Metro Transit to ensure that there is adequate <br />transit to serve the Twin Lakes Business Park. A medical office building would provide the <br />needed volume to serve the area. In addition, there are other potential programs that can be <br />accessed, such as dedicated bus wags serving reverse commuters from the core cities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.