My WebLink
|
Help
|
About
|
Sign Out
Home
2003_1117_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2003
>
2003_1117_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2011 8:35:03 AM
Creation date
10/19/2011 2:07:46 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.11, The proposal includes a small infiltrationMorage area for stoma water management associated <br />with the Phase I parking lot. To assist with rate control, roof ponding will be incorporated into <br />the design of each phased structure_ This plan must be reviewed and approved by the Capital <br />Regions watershed and the Roseville Public words Department. <br />5.12 The Phase I proposal includes two sign locations; one along County road C at the access drive <br />to the school parking lot and the other at the northwest corner of Rice Street and County Load <br />C. The sign proposed along County Road C has a 12 foot setback from the property line and <br />the sign in the northwest corner has a minimum setback of 16 feet and is outside the traffic <br />visibility triangle. <br />Second Floor <br />15 classrooms <br />4 support rooms <br />offices <br />library <br />Third Floor <br />16 classrooms <br />4 support rooms <br />1 office <br />multi media room <br />Bathrooms and locker areas would be included on each level, and the basement, approximately <br />50,000 square feet in size would house mechanical equipment and storage. <br />5.14 Building materials would include face brick, architectural concrete, metal panels, glass} <br />aluminum framed curtain gall windows and/or other products consistent with the City Code. <br />PHASE II -- 5 to 15 Years <br />5.15 Phase II would entail the demolition of the north school and church allowing a major addition, <br />which would include the 1,200 seat sanctuary} offices} meeting rooms, classrooms* social <br />hall/dining room, 334 surface parking spaces and associated site work. <br />FF3449 — RCA Final Development - 111 703 Pagc 4 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.