Laserfiche WebLink
A. Project Overview <br />Master Plan — Includes Phase 1 and phase 2 <br />North Heights Lutheran Church is proposing the constn.iction of a new 1,200 seat <br />any: to E'iry and -12 Sch ooI to rep] ace thei r ex i sti ng 400 seat S anctu ary and -8 <br />School on the existing site. The site for this campus is located on the northwest <br />quadrant of Rice Street and County Road C in Roseville, MN. The proposed 134,930 <br />s.f. . building footprint will be located on the existing 11.4 acre site . The full Laster <br />Plan bui l dou t is proposed to be accomplished in two (2) separate phases to be <br />constructed at two (2) different time frames. <br />The site work Includes parking. landscaping and playing fields. <br />B. Project Description: <br />It is [lie desire of North Heights Lutheran Church to serve our community with <br />spi6tual life and growth in all areas the church serves. North Heights Christian <br />Academy has outgrown the present facilities and needs upgraded facilities to fall <br />serve its purposes_ The church facilities are outdated and insufficient to meet the <br />needs of the future. <br />The proposed three story School with a basement WOUld be located on the southeast <br />corner of the site. When the K-12 school grows to capacity, there would be three <br />classrooms of 20 -25 students for each grade level with special activity support spaces <br />including, library, science labs and administration. Students will net he bused to <br />school -Cind bUSing is planned for special off site classes or acts hies only. Student <br />parking would be off' - street pcarking by permit only. <br />The proposed central one story support space would connect the School and the <br />Sanctuary. This area of the building would include the shared functions of a Kitchen <br />afeteri a/Fellows hi p Hall, Meeting Rooms, Classrooms, a 400 seat gy m, 750 s eat <br />auditorium and an area for Day Care. <br />The proposed Sanctuary and two story support areas would be located in the north end <br />of the building. This area of the building would include a 1,200 seat Sanctuary, <br />Offices, Weting I oorns and Classrooms. <br />Exterior finish materials are masonry+ and metal window and door systems. <br />The site consists of two parking lots. A. north lot with 334 parking spaces and a south <br />lot with 83 paving spaces_ The soccer field and softball field will overlap each other. <br />The remainder of the site will be the proposed building and landscaped green space. <br />