My WebLink
|
Help
|
About
|
Sign Out
Home
2003_1117_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2003
>
2003_1117_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2011 8:35:03 AM
Creation date
10/19/2011 2:07:46 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. Other <br />Traffic: <br />This Phase 1 will not change the traffic scenario for the sanctuary or the school. <br />School: Monday -- Friday, there are 2 five -year cycles that are in sync with the <br />Roseville public school system: <br />Early cycle: Start at 8:5 a.m.1 dismiss at 3:10p.m. <br />Late cycle: Start at 9: 0a. m. / dismiss at 140p. m. <br />The traffic in and out of the site has flowed well to the past and should not he a <br />problem with the new facilities. <br />Snow Removal.- <br />Snow fi-OM the SOUth parking lot will lie plowed to the SOLHII green area adj'rcent to <br />Counter Road C. <br />End of Narrative. <br />
The URL can be used to link to this page
Your browser does not support the video tag.