Laserfiche WebLink
A. Project Over-view <br />Master Plan — Includes phase I and phase 2 <br />North .Heights Lutheran Church is proposing the construction of a new 1,200 seat <br />Sanctuary and K-12 School to replace their existing 400 seat Sanctuary and -8 <br />School on the existing site. The site for this campus is located on the northwest <br />quadrant of Rice Street and County Road C in Roseville, MN. The proposed 134:930 <br />s.f. . building footprint will he located on the existing 11.4 acre site . The full Master - <br />Plan b ui ldo ut is proposed to be accomplished in two (2) separate phases to be <br />constructed at two (2) different time frames. <br />The site work . InclUdes parking, ltrndscr'_'tp1ng and phiving fields. <br />B. Project Description: <br />It is the, desire of Noilh Heights Lutheran ChLir-Ch to scree OL117 community with <br />spiritual life, and growth in all areas the church serves. North Heights Christian <br />Academy has outgrown the present facilities and reeds upgraded facilities to fully <br />serve its purposes. The church facilities are outdated and insufficient to meet the <br />needs of the future_ <br />The proposed three story School with a basement would be located on the southeast <br />comer of the site, When the K-12 school grows to capacity, there would be three <br />classrooms of 20-25 students for each garde level with special activity support spaces <br />including, library, science labs and administration. Students will not be bused to <br />school and bLasin� is planned for speci',d off site classes or activities only. tLrdent <br />parking would be off-street parking by peer E only. <br />The proposed central one story support space would connect the School and the <br />Sanctuary. This area of the building would include the shared functions of a Kitchen, <br />afeten* afFel lowship Hall, Meeting Dooms, Classrooms, a 400 seat gym, 750 seat <br />auditorium and an area for Day Care. <br />The proposed Sanctuary and two story support areas would he located in the north end <br />of the building. This area of the building would include a 1,200 seat Sanctuary, <br />Offices, Meeting Rooms and Classrooms. <br />Exterior finish materials are masonry and metal window and door .5vstetns. <br />The -site consists of two parking lots. A north lot with 334 parking spaces and a south <br />lot Nvith 83 parking spaces. The soccer field and softball field will overlap each other. <br />The remainder of the site will be the proposed building and landscaped green space* <br />