My WebLink
|
Help
|
About
|
Sign Out
Home
2003_1020_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2003
>
2003_1020_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2011 8:05:21 AM
Creation date
10/19/2011 2:56:05 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
provided at bid opening. The total cost for Alternate #2 is $17,050. The total cost for Alternate <br />46 is $19,265. <br />Financial Implications: Bid Groups #30 and #36 and the High Density Storage systems were <br />included in the project budget summary provided the Council on September 22, 2003. These <br />bids are consistent with the project estimate for these items. We feel we are within the project <br />budget with an adequate contingency at this time to approve Alternates #2 and #6. <br />Motion to award the following bids: <br />Bid Group #30 Display Boards <br />Mid - American Business Systems $12,198 <br />Bid Group #36 Wire Mesh Partitions <br />Central Wire & Iron Works $10,160 <br />Two high density storage systems <br />Tab Products $24,447.73 <br />and award the following alternates: <br />Alternate #2 High Efficient Light Fixtures <br />%17-050 <br />Alternate #6 Brick Screen Wall in lieu of Ornamental Fencing <br />$19,265 <br />Prepared By: Duane Schwartz <br />
The URL can be used to link to this page
Your browser does not support the video tag.