Laserfiche WebLink
provided at bid opening. The total cost for Alternate #2 is $17,050. The total cost for Alternate <br />46 is $19,265. <br />Financial Implications: Bid Groups #30 and #36 and the High Density Storage systems were <br />included in the project budget summary provided the Council on September 22, 2003. These <br />bids are consistent with the project estimate for these items. We feel we are within the project <br />budget with an adequate contingency at this time to approve Alternates #2 and #6. <br />Motion to award the following bids: <br />Bid Group #30 Display Boards <br />Mid - American Business Systems $12,198 <br />Bid Group #36 Wire Mesh Partitions <br />Central Wire & Iron Works $10,160 <br />Two high density storage systems <br />Tab Products $24,447.73 <br />and award the following alternates: <br />Alternate #2 High Efficient Light Fixtures <br />%17-050 <br />Alternate #6 Brick Screen Wall in lieu of Ornamental Fencing <br />$19,265 <br />Prepared By: Duane Schwartz <br />