Laserfiche WebLink
than placing, the curbside recycling container or deliberately <br />dropping the container when the bottom of the container is <br />more than four feet above the ground. <br />C) Missing Entire Streets <br />500_00 for each incident of the Contractor missing an entire <br />street. A missed street would be defined as a street where <br />residents from at least three households on that street report <br />that they had their material out before 7 :00 a.m., the material <br />was not picked up, the recyclables were property sorted} and <br />the addresses did not appear on the Contractor's conveyance <br />sheets as "Late Set Outs"'. <br />d} Zone Collection Not Completed <br />$1,000.00 for each incident of failure to complete collection <br />when the Contractor has not received an extension of <br />collection hours from the recycling Coordinator- or <br />designated alternate. <br />e) Failure to Complete a Majority (50 %) of the Collection <br />District <br />$21500.00 each incident. <br />f} Failure to clean up material spilled by Contractor within <br />six (6) hours of verbal or written natificatinn <br />$50.00 each incident <br />g) Failure to maintain vehicle in manner which prevents <br />nuisances such as leafy seals or hydraulics <br />$100.00 each incident <br />h) Failure or neglect to provide notice to resident upon <br />recycling refused for collection for cause <br />5 each incident <br />i Failure or neglect to collect recycling from a missed <br />pickup location according to specifications in Item 14. <br />$50.00 each incident <br />19 <br />